7600 John W Carpenter Fwy
Dallas, TX 75247
Permit filed for 111-room building at 7600 John W Carpenter Fwy
A commercial new-construction permit for a 111-room building at 7600 John W Carpenter Fwy was filed in Dallas on December 5, 2025. The City of Dallas record lists permit COM-NEW-25-000283; it does not specify the building’s use.
Summarized from City of Dallas records · updated Dec 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 5, 2025
- since Dec 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7600 John W Carpenter Fwy
What is being built at 7600 John W Carpenter Fwy?
A City of Dallas commercial new-construction permit describes a 111-room building. The record does not specify its use.
When was the permit filed for 7600 John W Carpenter Fwy?
The permit was filed on December 5, 2025. Its number is COM-NEW-25-000283.
Is a hotel being built at 7600 John W Carpenter Fwy?
The permit describes a 111-room commercial building, but does not identify it as a hotel or state its use.
How many rooms are planned at 7600 John W Carpenter Fwy?
The permit description says the project has 111 rooms. It does not provide a square-footage figure.
What's being built near 1241 W. Mockingbird?
A permit for a 111-room commercial building was filed at 7600 John W Carpenter Fwy, about 425 meters from 1241 W. Mockingbird. The permit was filed December 5, 2025.
Who is building the project at 7600 John W Carpenter Fwy?
The City of Dallas permit record does not name an owner or developer.
Also being built nearby
All of 75247- 7600 W. John Carpenter Frwy · Brp Hospitality LLCApr 24, 2024Dallas towneplace suites — new construction — new ground up 5 storied, type iiib, fully sprinklered hotel building with site and landscape work
- 7800 John W Carpenter FwyJan 26, 2021Install swimming pool · 136 m away
- 7901 John W Carpenter FwyApr 29, 2026Gas pressure test · 162 m away
- 7901 John Carpenter Freeway · Montgomery Law OfficeFeb 18, 2025Montgomery law office — renovation/alteration — remodel · 162 m away
- 1111 W Mockingbird LnSep 1, 2026Bu & zo finish out for unit 660 b - 4 offices and a podcast studio · 175 m away
- 8001 N Stemmons FwyNov 18, 2026Replace meter base · 223 m away
- 8001 John W Carpenter FwyApr 13, 2026Install 27 total pilings · 306 m away
- 7442 N Stemmons FwyOct 16, 2026Txdot project csj#0196-03-293 (electrical service for roadway illumination) · 307 m away
- 7118 Envoy CtDec 4, 2025Gas test · 307 m away
- 7203 John W Carpenter FwyJan 6, 2026400 amp outdoor panel rack for a truck yard · 328 m away
- 7260 N Stemmons FwyJan 14, 2021Install water heater · 340 m away
- 7600 Ambassador RowJul 23, 2026--custom 18ft slide gate manualinstallation of one (1) 18-foot sliding gate with reinforced concrete channel, complete with all required posts, wheels, heavy-duty rollers, and track system. scope includes:fabrication of the gate frame and all necessary hardwaresupply of all materials including posts, wheels, rollers, and trackexcavation and pouring of reinforced concrete channelinstallation of gate posts and alignment for proper supportmounting of heavy-duty rollers and track systemfinal assembly and adjustments for smooth and reliable operation--custom 37ft slide gate installation of one (1) 37-foot sliding gate with reinforced concrete channel, complete with all required posts, wheels, heavy-duty rollers, and track system. scope includes:fabrication of the gate frame and all necessary hardwaresupply of all materials including posts, wheels, rollers, and trackexcavation and pouring of reinforced concrete channelinstallation of gate posts and alignment for proper supportmounting of heavy-duty rollers and track systemfinal assembly and adjustments for smooth and reliable operation--fencing laborlocation:front, right and left side of building excluding the backinstallation of 485 linear feet of 8-foot iron fencingincludes all labor for post setting, panel alignment, and weldingwelding and assembly performed per site requirementscustomer will provide all fencing materialsdemo 190ft of fencing and gates.--liftmaster sl3000 1 hp1/2 and 1 hp ac high traffic commercial slide gate operatorsideal for heavy-traffic applications1/2 hp rated for gates 50ft and 1,000 lbs. 1 hp rated for gates 50ft and 2,000 lbs.integrates easily with liftmaster access control technology.photo eye brackets chain and hardware. --lpr camerainstall and configure a license plate reader (lpr) camera at the gate operator, including:-mounting the lpr camera securely for optimal plate visibility-running and connecting all necessary wiring to the gate operator system-integrating the camera with the gate control software for automated vehicle access--gooseneck post for keypadinstall gooseneck post for keypad, including secure anchoring, proper alignment for vehicle access, and mounting of keypad to meet operational height and safety standards.--unifi g3 intercommounting the intercom unit at the gate locationconnecting to existing network infrastructureconfiguring audio and video functionalityintegrating with the gate access control system for remote entrytesting and verifying proper operation--run ethernet and powerrun ethernet and 120v power cables for the telephone entry system and operatorpull cables from the main network hub and electrical source to the entry unit locationinstall pathways, including cutting concrete where necessaryseal all cuts and penetrations to maintain structural integrityinstall necessary jacks, terminations, and electrical outletstest both ethernet connectivity and 120v power supplyensure full system integration with the building’s communication and power network--safety and exit loopproviding and installing loop detectors and loop harnessessaw-cutting pavement for loop wire placementinstalling and securing loop wire in saw cutsbackfilling and sealing all saw cuts for durabilityconnecting loops to gate operator and integrating with access control systemtesting and verifying full functionality of shadow, interrupt, and exit loopsproviding all labor and materials required for complete installation · 348 m away