8001 John W Carpenter Fwy
Dallas, TX 75247
Foundation repair permit for 27 pilings in Dallas
A commercial foundation repair permit indicates that 27 pilings will be installed at 8001 John W Carpenter Fwy. The City of Dallas permit was filed on April 13, 2026, under permit number COM-FDN-26-000041.
Summarized from City of Dallas records · updated Apr 13, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 13, 2026
- since Dec 9, 2020
- Largest scope
- —
- Listed value
- $28
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 8001 John W Carpenter Fwy
What is being built at 8001 John W Carpenter Fwy?
A City of Dallas permit indicates commercial foundation repair work involving the installation of 27 pilings.
What work does permit COM-FDN-26-000041 cover?
The permit description says, “Install 27 total pilings.” It is categorized as commercial foundation repair.
When was the foundation repair permit filed?
The City of Dallas filed permit COM-FDN-26-000041 on April 13, 2026.
How many pilings are planned at 8001 John W Carpenter Fwy?
The permit description specifies 27 total pilings.
Is this a new building at 8001 John W Carpenter Fwy?
The available permit record describes commercial foundation repair and the installation of 27 pilings; it does not describe construction of a new building.
Also being built nearby
All of 75247- 7800 John W Carpenter FwyJan 26, 2021Install swimming pool · 179 m away
- 8120 Ambassador Row · Ambassador Holdings, LLCAug 13, 2026Add 400 amp panel & feeder · 282 m away
- 8301 John W Carpenter FwyNov 26, 2025Gas test · 282 m away
- 8321 John W Carpenter FwyJul 22, 2026Check in with customer upon arrival and loto existing carrier mini split system and dispose of per epa guidelines. * provide and install a new 3/4-ton carrier mini split heat pump system with all grainger requirements. * verify cooling operation of the new carrier system. * clean up workspace and check out with the customer once completed · 301 m away
- 7600 John W Carpenter FwyDec 5, 2025111 rooms · 306 m away
- 7600 W. John Carpenter Frwy · Brp Hospitality LLCApr 24, 2024Dallas towneplace suites — new construction — new ground up 5 storied, type iiib, fully sprinklered hotel building with site and landscape work · 306 m away
- 8181 Ambassador RowJul 30, 2026Waterline repair in front yard · 320 m away
- 1111 Empire Central PlAug 12, 2026Remove existing damage driveway and replacing · 334 m away
- 1100 Empire Central PlSep 19, 2025Replace 1 1/2 rpz in cooling tower exteriror · 363 m away
- 8401 John W Carpenter FwyOct 7, 2025Like for like change out of (3) existing rtus on building. tonnage and options same as existing. no units over 25t · 387 m away
- 1150 Empire Central PlMar 16, 2026Replace damage service wire due to vandalism. this is an emergency service application because the suite is without power since march 1 · 398 m away
- 7600 Ambassador RowJul 23, 2026--custom 18ft slide gate manualinstallation of one (1) 18-foot sliding gate with reinforced concrete channel, complete with all required posts, wheels, heavy-duty rollers, and track system. scope includes:fabrication of the gate frame and all necessary hardwaresupply of all materials including posts, wheels, rollers, and trackexcavation and pouring of reinforced concrete channelinstallation of gate posts and alignment for proper supportmounting of heavy-duty rollers and track systemfinal assembly and adjustments for smooth and reliable operation--custom 37ft slide gate installation of one (1) 37-foot sliding gate with reinforced concrete channel, complete with all required posts, wheels, heavy-duty rollers, and track system. scope includes:fabrication of the gate frame and all necessary hardwaresupply of all materials including posts, wheels, rollers, and trackexcavation and pouring of reinforced concrete channelinstallation of gate posts and alignment for proper supportmounting of heavy-duty rollers and track systemfinal assembly and adjustments for smooth and reliable operation--fencing laborlocation:front, right and left side of building excluding the backinstallation of 485 linear feet of 8-foot iron fencingincludes all labor for post setting, panel alignment, and weldingwelding and assembly performed per site requirementscustomer will provide all fencing materialsdemo 190ft of fencing and gates.--liftmaster sl3000 1 hp1/2 and 1 hp ac high traffic commercial slide gate operatorsideal for heavy-traffic applications1/2 hp rated for gates 50ft and 1,000 lbs. 1 hp rated for gates 50ft and 2,000 lbs.integrates easily with liftmaster access control technology.photo eye brackets chain and hardware. --lpr camerainstall and configure a license plate reader (lpr) camera at the gate operator, including:-mounting the lpr camera securely for optimal plate visibility-running and connecting all necessary wiring to the gate operator system-integrating the camera with the gate control software for automated vehicle access--gooseneck post for keypadinstall gooseneck post for keypad, including secure anchoring, proper alignment for vehicle access, and mounting of keypad to meet operational height and safety standards.--unifi g3 intercommounting the intercom unit at the gate locationconnecting to existing network infrastructureconfiguring audio and video functionalityintegrating with the gate access control system for remote entrytesting and verifying proper operation--run ethernet and powerrun ethernet and 120v power cables for the telephone entry system and operatorpull cables from the main network hub and electrical source to the entry unit locationinstall pathways, including cutting concrete where necessaryseal all cuts and penetrations to maintain structural integrityinstall necessary jacks, terminations, and electrical outletstest both ethernet connectivity and 120v power supplyensure full system integration with the building’s communication and power network--safety and exit loopproviding and installing loop detectors and loop harnessessaw-cutting pavement for loop wire placementinstalling and securing loop wire in saw cutsbackfilling and sealing all saw cuts for durabilityconnecting loops to gate operator and integrating with access control systemtesting and verifying full functionality of shadow, interrupt, and exit loopsproviding all labor and materials required for complete installation · 428 m away