New 6-gallon water heater permitted at 8801 Ambassador Row
A City of Dallas commercial plumbing permit records installation of a new 6-gallon water heater at 8801 Ambassador Row. The permit was filed July 21, 2026; it does not describe a larger construction project.
Summarized from City of Dallas records · updated Jul 21, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 21, 2026
- since Jul 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 8801 Ambassador Row
What is being built at 8801 Ambassador Row?
A City of Dallas permit records installation of a new 6-gallon water heater. It does not identify a new building or other construction.
When was the water heater permit filed at 8801 Ambassador Row?
The permit was filed July 21, 2026.
What is the permit number for 8801 Ambassador Row?
The City of Dallas commercial plumbing permit number is COM-PLM-26-002712.
Is a new building planned at 8801 Ambassador Row?
The available record describes only installation of a new 6-gallon water heater; it does not mention a new building.
What work is permitted near Sovereign Row Addition?
At 8801 Ambassador Row, about 359 meters from Sovereign Row Addition, a City of Dallas permit records installation of a new 6-gallon water heater.
Also being built nearby
All of 75247- 8700 Ambassador RowMay 10, 2026Run gas line to generator · 77 m away
- 8908 Ambassador RowJun 17, 2025Re-roof - no structural changes.remove existing roof system, down to the steel deck. install (2) layers of 2.2" insulation. install gaf, white, tpo, 60-mil roof system, mechanically attached · 103 m away
- 8617 Ambassador RowJul 9, 2026Installation of a new pallet racking system within an existing commercial warehouse. the scope of work includes the placement of selective pallet rack structures covering approximately 762 square feet of floor area. work consists of anchoring uprights to the existing concrete slab, installing beams, and assembling rack components per the engineered drawings. no modifications will be made to the building’s structural elements, electrical systems, plumbing, or mechanical systems. this project is limited to the installation of storage racks only. all racking will be installed per the stamped engineering plans and calculations provided, and the system will be used for high?pile storage as defined by the fire code · 139 m away
- 8607 Ambassador RowJan 30, 2026Electrical remodel · 147 m away
- 9004 Ambassador Row · Ambassador Holdings, LLCJul 2, 2026Add 4 inch one way clean.outs on main sewer line towards city tap roughly 60 feet away from main clean out and spot repair on broken line at clean out in same location · 281 m away
- 8400 Ambassador RowNov 3, 2025Interior plumbing remodel · 304 m away
- 9011 John W Carpenter FwyDec 11, 2025Gas test · 340 m away
- 8804 Sovereign RowDec 9, 2025Gas repair with test · 348 m away
- 8720 Sovereign RowNov 9, 2020Remove add/remove equipment existing structure. no change mw eqip · 353 m away
- 8900 Sovereign Row · Bf & Jf, LLCNov 9, 2026Additional 20ft x 138ftfor the building · 359 m away
- 8908 Sovereign RowFeb 10, 202622 x 59 steel carport free standing steel carport post in concrete · 362 m away
- 8600 Sovereign RowOct 29, 2026Electrical no work permit · 379 m away