15556 Leavalley Cir
Dallas, TX 75248
Water line reroute permitted at Dallas residence
A City of Dallas residential plumbing permit filed December 9, 2025, indicates a water line is being rerouted overhead at 15556 Leavalley Cir. A separate 2020 permit records foundation repair at the address.
Summarized from City of Dallas records · updated Dec 9, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 9, 2025
- since Dec 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 15556 Leavalley Cir
What is being done at 15556 Leavalley Cir?
A City of Dallas residential plumbing permit describes rerouting a water line overhead. The permit, RES-PLM-25-008567, was filed December 9, 2025.
When was the water line work permitted?
The City of Dallas filed permit RES-PLM-25-008567 on December 9, 2025.
Is a new home being built at 15556 Leavalley Cir?
The records provided do not indicate new construction. They show a water line reroute permit from 2025 and a foundation repair permit from 2020.
What other permits are recorded for this address?
A City of Dallas permit dated January 27, 2020, records foundation repair. The latest record is the December 9, 2025, residential plumbing permit for rerouting a water line overhead.
What is being permitted near Richardson ISD?
At 15556 Leavalley Cir, near Richardson ISD at 7630 Arapaho Rd, a City of Dallas permit indicates a water line is being rerouted overhead. It was filed December 9, 2025.
Also being built nearby
All of 75248- 15516 Leavalley CirMay 15, 2025Replace sewer line under the house and out to the city tap · 65 m away
- 15525 Leavalley CirJul 10, 2026Gas test · 65 m away
- 15521 Leavalley CirSep 25, 2020Remodel existing plumbing · 70 m away
- 15645 Terrace Lawn CirDec 8, 2025Installed 40 gallon ao smith gas water heater · 71 m away
- 15512 Leavalley CirOct 22, 2026Sewer line repair via tunnel · 73 m away
- 15651 Terrace Lawn CirJul 31, 2025Repair sewer line via 15' trench and 12' tunnel · 74 m away
- 15515 Leavalley CirJun 18, 2026Remove existing cast iron main sewer line and replace it with new schedule 40 pvc · 78 m away
- 7410 La Cosa DrJan 22, 2026Installing prv in front of home · 114 m away
- 15625 Kingscrest CirNov 24, 2025Replacing 4 ton gas hvac system · 166 m away
- 15541 Branchcrest CirAug 13, 2025Mcr installation of a grid tied, roof mounted, solar pv system with mpu + mdu · 176 m away
- 15645 Kingscrest CirJun 25, 2025Slab is approximately 1.5" difference on the center and south sections. need to install piers on the south half and level the slab · 177 m away
- 15646 Kingscrest CirNov 6, 2025For the installation of solar panels and energy storage · 187 m away