15651 Terrace Lawn Cir
Dallas, TX 75248
15651 Terrace Lawn Cir: 1 project on record
City of Dallas lists 1 filing across 1 project at 15651 Terrace Lawn Cir, Dallas, TX 75248. The most recent, filed July 31, 2025, covers: “Repair sewer line via 15' trench and 12' tunnel”.
Compiled from City of Dallas records · updated Jul 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 31, 2025
- since Jul 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 15651 Terrace Lawn Cir
What is being built at 15651 Terrace Lawn Cir?
The latest filing (City of Dallas permit RES-PLM-25-003070, July 31, 2025) covers repair sewer line via 15' trench and 12' tunnel.
How many permits and filings does 15651 Terrace Lawn Cir have?
1 filing across 1 project, from July 31, 2025 to July 31, 2025.
Is there other construction near 15651 Terrace Lawn Cir?
Yes. Nearby filings include 15645 Terrace Lawn Cir (installed 40 gallon ao smith gas water heater, Dec 8, 2025); 15556 Leavalley Cir (reroute water line overhead, Dec 9, 2025); 15525 Leavalley Cir (gas test, Jul 10, 2026).
How do I get alerts for new permits at 15651 Terrace Lawn Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 15645 Terrace Lawn CirDec 8, 2025Installed 40 gallon ao smith gas water heater · 14 m away
- 15556 Leavalley CirDec 9, 2025Reroute water line overhead · 74 m away
- 15525 Leavalley CirJul 10, 2026Gas test · 105 m away
- 15625 Kingscrest CirNov 24, 2025Replacing 4 ton gas hvac system · 108 m away
- 15521 Leavalley CirSep 25, 2020Remodel existing plumbing · 114 m away
- 15516 Leavalley CirMay 15, 2025Replace sewer line under the house and out to the city tap · 120 m away
- 15515 Leavalley CirJun 18, 2026Remove existing cast iron main sewer line and replace it with new schedule 40 pvc · 128 m away
- 15512 Leavalley CirOct 22, 2026Sewer line repair via tunnel · 129 m away
- 15645 Kingscrest CirJun 25, 2025Slab is approximately 1.5" difference on the center and south sections. need to install piers on the south half and level the slab · 132 m away
- 15646 Kingscrest CirNov 6, 2025For the installation of solar panels and energy storage · 139 m away
- 7410 La Cosa DrJan 22, 2026Installing prv in front of home · 174 m away
- 15541 Branchcrest CirAug 13, 2025Mcr installation of a grid tied, roof mounted, solar pv system with mpu + mdu · 179 m away