City of Dallas lists 2 filings across 2 projects at 16014 Chalfont Cir, Dallas, TX 75248. The most recent, filed August 26, 2025, covers: “Water line repair under driveway”.
Compiled from City of Dallas records · updated Aug 26, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 26, 2025
- since Aug 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 16014 Chalfont Cir
What is being built at 16014 Chalfont Cir?
The latest filing (City of Dallas permit RES-PLM-25-004109, August 26, 2025) covers water line repair under driveway.
How many permits and filings does 16014 Chalfont Cir have?
2 filings across 2 projects, from August 26, 2025 to August 26, 2025.
Is there other construction near 16014 Chalfont Cir?
Yes. Nearby filings include 16008 Chalfont Cir (replacing a 200 amp meter base, 200 amp main disconnect, grounding and surge protection, Apr 10, 2026); 16022 Chalfont Cir (electric panel change out, Oct 7, 2026); 16031 Chalfont Cir (furnace and coil, Jun 26, 2025).
How do I get alerts for new permits at 16014 Chalfont Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 16008 Chalfont CirApr 10, 2026Replacing a 200 amp meter base, 200 amp main disconnect, grounding and surge protection · 9 m away
- 16022 Chalfont CirOct 7, 2026Electric panel change out · 12 m away
- 16031 Chalfont CirJun 26, 2025Furnace and coil · 16 m away
- 16021 Chalfont CirMar 17, 2026Replacing 50 gallon electric water heater in closet · 19 m away
- 16002 Chalfont CirNov 25, 20255 ton system replacmeent · 19 m away
- 16017 Chalfont CirJul 8, 202516017 chalfont cir, dallas tx, 75248-----50 gallon gas water heater install · 20 m away
- 16005 Chalfont CirDec 22, 2025Replacing 50 gallon gas water heater · 24 m away
- 16190 Chalfont CirAug 6, 2025Installing 5 steel reinforced solid concrete bell bottom piers in the steps in the back patio for stabilizing. and also injecting polyurethane foam for void fill. back patio · 48 m away
- 16168 Chalfont CirOct 15, 2020Install water heater · 114 m away
- 16010 Chalfont PlJun 8, 2026Take off existing roof and replace with gaf timberline hdz (charcoal) · 118 m away
- 16143 Chalfont CirApr 25, 2026Installing 5 ton complete gas system with duct work · 121 m away
- 16144 Chalfont CirJul 14, 2026Replacing 50 gallon gas water heater · 161 m away