16031 Chalfont Cir
Dallas, TX 75248
16031 Chalfont Cir: 1 project on record
City of Dallas lists 1 filing across 1 project at 16031 Chalfont Cir, Dallas, TX 75248. The most recent, filed June 26, 2025, covers: “Furnace and coil”.
Compiled from City of Dallas records · updated Jun 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 26, 2025
- since Jun 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 16031 Chalfont Cir
What is being built at 16031 Chalfont Cir?
The latest filing (City of Dallas permit RES-MEC-25-000995, June 26, 2025) covers furnace and coil.
How many permits and filings does 16031 Chalfont Cir have?
1 filing across 1 project, from June 26, 2025 to June 26, 2025.
Is there other construction near 16031 Chalfont Cir?
Yes. Nearby filings include 16021 Chalfont Cir (replacing 50 gallon electric water heater in closet, Mar 17, 2026); 16017 Chalfont Cir (16017 chalfont cir, dallas tx, 75248-----50 gallon gas water heater install, Jul 8, 2025); 16005 Chalfont Cir (replacing 50 gallon gas water heater, Dec 22, 2025).
How do I get alerts for new permits at 16031 Chalfont Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 16021 Chalfont CirMar 17, 2026Replacing 50 gallon electric water heater in closet · 4 m away
- 16017 Chalfont CirJul 8, 202516017 chalfont cir, dallas tx, 75248-----50 gallon gas water heater install · 6 m away
- 16005 Chalfont CirDec 22, 2025Replacing 50 gallon gas water heater · 11 m away
- 16008 Chalfont CirApr 10, 2026Replacing a 200 amp meter base, 200 amp main disconnect, grounding and surge protection · 13 m away
- 16002 Chalfont CirNov 25, 20255 ton system replacmeent · 16 m away
- 16014 Chalfont CirAug 26, 2025Water line repair under driveway · 16 m away
- 16022 Chalfont CirOct 7, 2026Electric panel change out · 25 m away
- 16190 Chalfont CirAug 6, 2025Installing 5 steel reinforced solid concrete bell bottom piers in the steps in the back patio for stabilizing. and also injecting polyurethane foam for void fill. back patio · 43 m away
- 16168 Chalfont CirOct 15, 2020Install water heater · 112 m away
- 16143 Chalfont CirApr 25, 2026Installing 5 ton complete gas system with duct work · 126 m away
- 16010 Chalfont PlJun 8, 2026Take off existing roof and replace with gaf timberline hdz (charcoal) · 130 m away
- 16144 Chalfont CirJul 14, 2026Replacing 50 gallon gas water heater · 168 m away