groundranger
Recent · latest filing Jul 2026Residential

16738 Cleary Cir

Dallas, TX 75248

Foundation stabilization and electrical upgrades at 16738 Cleary Cir

City of Dallas permits indicate foundation stabilization and electrical service upgrades at this residence. The electrical permit was filed April 6, 2026, and the foundation repair permit was filed July 24, 2026.

Summarized from City of Dallas records · updated Jul 24, 2026

Projects
2
2 filings
Latest filing
Jul 24, 2026
since Apr 6, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. 16738 cleary install 10 concrete pilings to stabilize foundation

    16738 cleary install 10 concrete pilings to stabilize foundation

    City of Dallas permitResidential Foundation Repair
    Record
    RES-FDN-26-000596
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Service upgraded to 200 ampsreplace meterbase, panel & bring electrical equipment up to code. install service disconnect

    Service upgraded to 200 ampsreplace meterbase, panel & bring electrical equipment up to code. install service disconnect

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-001950
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 16738 Cleary Cir

What work is permitted at 16738 Cleary Cir?

City of Dallas records list a residential electrical upgrade and foundation repair. The foundation permit calls for installing 10 concrete pilings to stabilize the foundation.

When were permits filed for work at 16738 Cleary Cir?

The electrical permit, RES-ELC-26-001950, was filed April 6, 2026. The foundation repair permit, RES-FDN-26-000596, was filed July 24, 2026.

What electrical work is planned at 16738 Cleary Cir?

Permit RES-ELC-26-001950 describes upgrading the service to 200 amps, replacing the meter base and panel, adding a service disconnect, and bringing electrical equipment up to code.

Is the foundation being repaired at 16738 Cleary Cir?

Yes. A City of Dallas permit filed July 24, 2026, describes installing 10 concrete pilings to stabilize the foundation.

Is a new home being built at 16738 Cleary Cir?

The two supplied City of Dallas permits describe foundation repair and electrical upgrades, not new-home construction.

Also being built nearby

All of 75248
Get alerts for 16738 Cleary Cir