6034 White Rose Trl
Dallas, TX 75248
6034 White Rose Trl: 1 project on record
City of Dallas lists 1 filing across 1 project at 6034 White Rose Trl, Dallas, TX 75248. The most recent, filed September 5, 2025, covers: “6034 white rose install 17 concrete pilings to stabilize foundation”.
Compiled from City of Dallas records · updated Sep 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 5, 2025
- since Sep 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6034 White Rose Trl
What is being built at 6034 White Rose Trl?
The latest filing (City of Dallas permit RES-FDN-25-000438, September 5, 2025) covers 6034 white rose install 17 concrete pilings to stabilize foundation.
How many permits and filings does 6034 White Rose Trl have?
1 filing across 1 project, from September 5, 2025 to September 5, 2025.
Is there other construction near 6034 White Rose Trl?
Yes. Nearby filings include 6030 White Rose Trl (install 3 composite piersadjust 9 existing piers, Dec 4, 2025); 6026 White Rose Trl (gas test, Nov 5, 2026); 6023 White Rose Trl (foundation repair, Nov 3, 2025).
How do I get alerts for new permits at 6034 White Rose Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 6030 White Rose TrlDec 4, 2025Install 3 composite piersadjust 9 existing piers · 6 m away
- 6026 White Rose TrlNov 5, 2026Gas test · 13 m away
- 6023 White Rose TrlNov 3, 2025Foundation repair · 23 m away
- 6018 White Rose TrlNov 6, 2020Addition to sfd · 25 m away
- 6019 White Rose TrlNov 10, 2026Approximately 15ft tunnel under for sewer line repair. will be replacing cracked fitting · 28 m away
- 6015 White Rose TrlMar 23, 2026Remove and replace roof · 34 m away
- 6009 White Rose TrlJul 31, 2025Repair water line under the house in crawlspace where leak is at · 43 m away
- 6026 Yellow Rock TrlAug 21, 2026For this job, we returned to the home to complete the necessary repair. upon arrival, we cut an access hole in the wall to access the plumbing. we removed the leaking 1/2-inch copper water line and cut out the other two 1/2-inch water lines.we then brazed one coupling on the cold-water line and installed two 90-degree fittings—one on the hot-water line and one on the cold-water line. the lines were stubbed out and brought upward to make them more accessible. we then soldered the necessary fittings to reconnect the new piping to the existing copper above the slab.after allowing all joints to cool, we turned the water back on to the home and bled the air from the water lines. we checked the water meter, which showed no water usage, confirming that there were no apparent leaks at the time of completion · 88 m away
- 6031 Yellow Rock TrlAug 18, 2025Replace 5 ton coil only · 100 m away
- 6004 Yellow Rock TrlNov 3, 2026Because neighbor hit gas line · 101 m away
- 6019 Yellow Rock TrlAug 24, 2026Replace 50 gallon gas water heater in garage · 104 m away
- 6015 Yellow Rock TrlJun 25, 2025Replacing the existing fence. keeping the exact same size and location · 105 m away