6122 White Rose Trl
Dallas, TX 75248
6122 White Rose Trl: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 6122 White Rose Trl, Dallas, TX 75248. The most recent, filed September 18, 2025, covers: “Installation of 4 concrete piers and adjusting 3 existing piers for foundation repair”.
Compiled from City of Dallas records · updated Sep 18, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 18, 2025
- since Sep 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 6122 White Rose Trl
What is being built at 6122 White Rose Trl?
The latest filing (City of Dallas permit RES-FDN-25-000484, September 18, 2025) covers installation of 4 concrete piers and adjusting 3 existing piers for foundation repair.
How many permits and filings does 6122 White Rose Trl have?
2 filings across 2 projects, from September 18, 2025 to September 18, 2025.
Is there other construction near 6122 White Rose Trl?
Yes. Nearby filings include 6118 White Rose Trl (mcr with battery install roof mounted pv solar system and energy storage system, Oct 7, 2025); 6128 White Rose Trl (replace water heater & replace/test gas service, Oct 6, 2020); 6132 White Rose Trl (service repair, Oct 6, 2026).
How do I get alerts for new permits at 6122 White Rose Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 6118 White Rose TrlOct 7, 2025Mcr with battery install roof mounted pv solar system and energy storage system · 7 m away
- 6128 White Rose TrlOct 6, 2020Replace water heater & replace/test gas service · 10 m away
- 6132 White Rose TrlOct 6, 2026Service repair · 17 m away
- 6107 White Rose TrlDec 16, 2020Install water heater · 30 m away
- 6139 White Rose TrlJul 14, 2025Gas service from meter to house · 30 m away
- 6104 White Rose TrlSep 18, 2020Foundation repair · 31 m away
- 6103 White Rose TrlApr 16, 2026Tear down fence and then rebuildfence will be 6' tall side by side cedar wood with metal posts with cap and trimback fence line will have a kickboard retaining wall approx 3' tallon the survey you will see red and blue lines. the red lines indicate where the kickboard retaining wall will be at, that area will 9't all including the wall and fence. the blue lines are where the 6' fence will be atthe red x's indicate the gateshomeowners would like the pickets facing the inside, not the outside · 36 m away
- 15322 Trails End DrAug 5, 2025Replace 1- 5 ton furnace · 74 m away
- 15319 Trails End DrJun 1, 202630 yr. shingle (certainteedclass 3) - including ridge- remove and replace - drip edge- remove and replace with synthetic felt- remove and replace all ventilation and soft metals(pipe jacks, rain caps)- install ice - n - water shield in valleys and penetrationsto protect water from intruding- protect landscape and clean up job site · 82 m away
- 15315 Trails End DrNov 13, 2026Replace existing damaged kitchen sewer line under the home · 84 m away
- 6122 Yellow Rock TrlAug 27, 2026Replacement of 1 complete hvac system · 88 m away
- 6104 Yellow Rock TrlJan 7, 2021Replace or modify existing hvac · 93 m away