6139 White Rose Trl
Dallas, TX 75248
6139 White Rose Trl: 1 project on record
City of Dallas lists 1 filing across 1 project at 6139 White Rose Trl, Dallas, TX 75248. The most recent, filed July 14, 2025, covers: “Gas service from meter to house”.
Compiled from City of Dallas records · updated Jul 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 14, 2025
- since Jul 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6139 White Rose Trl
What is being built at 6139 White Rose Trl?
The latest filing (City of Dallas permit RES-PLM-25-002453, July 14, 2025) covers gas service from meter to house.
How many permits and filings does 6139 White Rose Trl have?
1 filing across 1 project, from July 14, 2025 to July 14, 2025.
Is there other construction near 6139 White Rose Trl?
Yes. Nearby filings include 6132 White Rose Trl (service repair, Oct 6, 2026); 6128 White Rose Trl (replace water heater & replace/test gas service, Oct 6, 2020); 6122 White Rose Trl (installation of 4 concrete piers and adjusting 3 existing piers for foundation repair, Sep 18, 2025).
How do I get alerts for new permits at 6139 White Rose Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 6132 White Rose TrlOct 6, 2026Service repair · 16 m away
- 6128 White Rose TrlOct 6, 2020Replace water heater & replace/test gas service · 21 m away
- 6122 White Rose TrlSep 18, 2025Installation of 4 concrete piers and adjusting 3 existing piers for foundation repair · 30 m away
- 6118 White Rose TrlOct 7, 2025Mcr with battery install roof mounted pv solar system and energy storage system · 36 m away
- 6107 White Rose TrlDec 16, 2020Install water heater · 55 m away
- 6104 White Rose TrlSep 18, 2020Foundation repair · 59 m away
- 6103 White Rose TrlApr 16, 2026Tear down fence and then rebuildfence will be 6' tall side by side cedar wood with metal posts with cap and trimback fence line will have a kickboard retaining wall approx 3' tallon the survey you will see red and blue lines. the red lines indicate where the kickboard retaining wall will be at, that area will 9't all including the wall and fence. the blue lines are where the 6' fence will be atthe red x's indicate the gateshomeowners would like the pickets facing the inside, not the outside · 61 m away
- 6140 Yellow Rock TrlAug 21, 2026Replacing 50 gallon gas water heater · 75 m away
- 6122 Yellow Rock TrlAug 27, 2026Replacement of 1 complete hvac system · 79 m away
- 6143 Yellow Rock TrlNov 12, 2025Adding five piers on the southeast and southwest corners of the home · 88 m away
- 6123 Yellow Rock TrlNov 13, 2026Demolition of the kitchen, pantry, wet bar and dining room closet down to the studs along with removing the walls between the pantry, wet bar and living room closet. plumbing: relocating plumbing lines for the refrigerator and icemaker, replacing any cast iron above grade with pvc and terminating plumbing at wet bar. run gas line to cooktop · 91 m away
- 6104 Yellow Rock TrlJan 7, 2021Replace or modify existing hvac · 94 m away