6408 Shortland Dr
Dallas, TX 75248
Home HVAC replacement and gas line repairs in Dallas
City of Dallas permits show residential work at 6408 Shortland Dr: repairs to minor gas line leaks were permitted on November 5, 2025, and an HVAC replacement was permitted on April 22, 2026. The records describe repairs and system replacement, not a new building.
Summarized from City of Dallas records · updated Apr 22, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 22, 2026
- since Nov 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 6408 Shortland Dr
What is being built at 6408 Shortland Dr?
City of Dallas permits record residential gas line repairs and an HVAC replacement at the address. They do not describe a new building.
Is a new home being built at 6408 Shortland Dr?
The permits listed for the address describe repairs to gas line leaks and an HVAC replacement, not new home construction.
Was an HVAC system replacement permitted at 6408 Shortland Dr?
Yes. City of Dallas permit RES-MEC-26-001843, dated April 22, 2026, is for an HVAC replacement.
What gas line work was permitted at 6408 Shortland Dr?
A City of Dallas residential plumbing permit records repairs to minor gas line leaks inside the home. Permit RES-PLM-25-007050 was dated November 5, 2025.
When were permits filed for work at 6408 Shortland Dr?
The earliest listed filing was November 5, 2025, for gas line repairs. The latest was April 22, 2026, for an HVAC replacement.
Also being built nearby
All of 75248- 6401 Shortland DrSep 8, 2026Ductworkfull complete new system installation · 16 m away
- 6410 Risinghill DrOct 16, 2026Main line repair 50 ft · 96 m away
- 6412 Risinghill DrOct 24, 20255-foot tunnel to repair cold water slab leak · 96 m away
- 7202 Duffield DrJan 7, 2026Addition of a side fence · 146 m away
- 7005 Wester WayJun 17, 2025Foundation repair / installation of 8 steel exterior piers. per homeowner's request, engineer's proposed installation of 52 piers is to take place in phases. phase 2, with engineer's approval, involves the installation of 8 steel exterior piers as shown on the additional document with red x noting the locations · 150 m away
- 7115 Duffield DrMar 10, 20267115 duffield install 5 concrete pilings to stabilize foundation · 154 m away
- 7203 Duffield DrOct 21, 2026Gas inspection final · 158 m away
- 6508 Risinghill DrNov 3, 20265 ton carrier gold package complete system / hvac replacement · 163 m away
- 6510 Risinghill DrMar 9, 2026Replacing 5 ton gas complete system · 166 m away
- 7001 Wester WayNov 25, 2025Install tankless water heater in second story attic · 169 m away
- 7015 Wester WayOct 7, 2020Plumbing (pl) single family alteration · 173 m away
- 17111 Wester PlNov 17, 2026Foundation repair - install 22 piers · 177 m away