groundranger
Recent · latest filing Jun 2025Residential

7005 Wester Way

Dallas, TX 75248

7005 Wester Way: 1 project on record

City of Dallas lists 1 filing across 1 project at 7005 Wester Way, Dallas, TX 75248. The most recent, filed June 17, 2025, covers: “Foundation repair / installation of 8 steel exterior piers. per homeowner's request, engineer's proposed installation of 52 piers is to take place in phases. phase 2, with engineer's approval, involves the installation of 8 steel exterior piers as shown on the additional document with red x noting the locations”.

Compiled from City of Dallas records · updated Jun 17, 2025

Projects
1
1 filings
Latest filing
Jun 17, 2025
since Jun 17, 2025
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Foundation repair / installation of 8 steel exterior piers. per homeowner's request, engineer's proposed installation of 52 piers is to take place in phases. phase 2, with engineer's approval, involves the installation of 8 steel exterior piers as shown on the additional document with red x noting the locations

    Foundation repair / installation of 8 steel exterior piers. per homeowner's request, engineer's proposed installation of 52 piers is to take place in phases. phase 2, with engineer's approval, involves the installation of 8 steel exterior piers as shown on the additional document with red x noting the locations

    City of Dallas permitResidential Foundation Repair
    Record
    RES-FDN-25-000152
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 7005 Wester Way

What is being built at 7005 Wester Way?

The latest filing (City of Dallas permit RES-FDN-25-000152, June 17, 2025) covers foundation repair / installation of 8 steel exterior piers. per homeowner's request, engineer's proposed installation of 52 piers is to take place in phases. phase 2, with engineer's approval, involves the installation of 8 steel exterior piers as shown on the additional document with red x noting the locations.

How many permits and filings does 7005 Wester Way have?

1 filing across 1 project, from June 17, 2025 to June 17, 2025.

Is there other construction near 7005 Wester Way?

Yes. Nearby filings include 7001 Wester Way (install tankless water heater in second story attic, Nov 25, 2025); 17111 Wester Pl (foundation repair - install 22 piers, Nov 17, 2026); 6901 Mckamy Blvd (install 1/2" poly pipe in yard, Oct 23, 2026).

How do I get alerts for new permits at 7005 Wester Way?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75248
Get alerts for 7005 Wester Way