6908 Vista Willow Dr
Dallas, TX 75248
Permit covers replacement of two gas water heaters
A City of Dallas residential plumbing permit filed July 13, 2026, covers swapping two 50-gallon gas water heaters in a closet at 6908 Vista Willow Dr. The record does not describe a new building or provide a project valuation.
Summarized from City of Dallas records · updated Jul 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 13, 2026
- since Jul 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6908 Vista Willow Dr
What is being built at 6908 Vista Willow Dr?
The July 13, 2026, City of Dallas permit describes replacement of two 50-gallon gas water heaters in a closet. It does not describe new construction.
Is a new home being built at 6908 Vista Willow Dr?
The available record is a residential plumbing permit for swapping two gas water heaters, not a permit for a new home.
What does permit RES-PLM-26-007213 cover?
It covers a swap of two 50-gallon gas water heaters in a closet at 6908 Vista Willow Dr. The City of Dallas filed the permit on July 13, 2026.
When was the water heater work permitted at 6908 Vista Willow Dr?
The City of Dallas filed permit RES-PLM-26-007213 on July 13, 2026.
How many water heaters are being replaced at 6908 Vista Willow Dr?
The permit description specifies two 50-gallon gas water heaters.
How much will the water heater work cost?
The available permit record does not report a project valuation or estimated cost.
Also being built nearby
All of 75248- 6906 Vista Willow DrJul 1, 2025Install 5 ton american standard complete system · 8 m away
- 6904 Vista Willow DrSep 28, 2020Remove existing roof and install new roof · 16 m away
- 6905 Vista Willow DrSep 2, 2025Meter change · 21 m away
- 6918 Vista Willow DrJun 23, 2026Electrical work for residential remodel · 41 m away
- 6921 Vista Willow DrOct 29, 2025Work to include under slab tunnel excavation to gain access to the defective drain lines servicing the ****master bath toilet****.• the sanitary sewer system servicing these fixtures will be replaced below-grade via tunneling.• all new pipe installed will be schedule 40 pvc.• work will include excavation of one access pit at the ****east side of home through gate directly in line with the 3” vent stack visible from the side of home**** exterior wall of the home.• work will include up to 10 linear feet of under slab tunneling · 51 m away
- 6927 Vista Willow DrSep 28, 2026Install 6 pilings · 75 m away
- 6929 Vista Willow DrJul 10, 2026Complete rebuild of customer main emergency shutoff · 83 m away
- 6905 Echo Bluff DrNov 10, 2026Mcr with battery installation of a 14.080 kw residential rooftop solar photovoltaic (pv) system consisting of (32) seg-440-btd 440w solar modules, (2) tesla powerwall 3 battery energy storage systems (11.5 kwh each, 240v, single-phase), and (1) tesla gateway 3. the battery energy storage system will be installed outdoors · 85 m away
- 6901 Echo Bluff DrJan 21, 2021Remodel existing plumbing · 91 m away
- 6906 Brentfield DrSep 18, 2026Nsfaa-renovation of existing first and second floor residence. addition of 761 sq ft on 2nd floor to add bathroom and bedrooms · 95 m away
- 6902 Brentfield DrJul 16, 2026Electrical work for remodeling · 97 m away
- 6917 Echo Bluff DrDec 19, 2025Replace 5 ton a/c equipment; using existing ductwork · 98 m away