6927 Vista Willow Dr
Dallas, TX 75248
Foundation and gas-pipe repairs permitted at 6927 Vista Willow Dr
City of Dallas records show residential repair work at 6927 Vista Willow Dr: a gas-pipe union replacement permitted March 17, 2026, followed by the installation of six pilings permitted September 28, 2026. The filings identify the work as residential plumbing and foundation repair.
Summarized from City of Dallas records · updated Sep 28, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 28, 2026
- since Mar 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 6927 Vista Willow Dr
What work is being done at 6927 Vista Willow Dr?
City of Dallas permits record a gas-pipe union replacement and foundation work involving six pilings. The permits were filed March 17 and September 28, 2026.
Is there foundation repair at 6927 Vista Willow Dr?
Yes. Permit RES-FDN-26-000816, filed September 28, 2026, describes the work as installing six pilings for residential foundation repair.
What plumbing work was permitted at 6927 Vista Willow Dr?
Permit RES-PLM-26-002879 records replacement of a 1½-inch union on the gas pipe entering the home. It was filed March 17, 2026.
When were repairs permitted at 6927 Vista Willow Dr?
The first listed permit was filed March 17, 2026, for plumbing work. A foundation repair permit followed on September 28, 2026.
How many pilings are being installed at 6927 Vista Willow Dr?
The City of Dallas foundation permit describes the installation of six pilings. The permit number is RES-FDN-26-000816, filed September 28, 2026.
Also being built nearby
All of 75248- 6929 Vista Willow DrJul 10, 2026Complete rebuild of customer main emergency shutoff · 8 m away
- 6921 Vista Willow DrOct 29, 2025Work to include under slab tunnel excavation to gain access to the defective drain lines servicing the ****master bath toilet****.• the sanitary sewer system servicing these fixtures will be replaced below-grade via tunneling.• all new pipe installed will be schedule 40 pvc.• work will include excavation of one access pit at the ****east side of home through gate directly in line with the 3” vent stack visible from the side of home**** exterior wall of the home.• work will include up to 10 linear feet of under slab tunneling · 25 m away
- 6933 Vista Willow DrJan 5, 2021Install water heater · 25 m away
- 6918 Vista Willow DrJun 23, 2026Electrical work for residential remodel · 35 m away
- 6936 Vista Willow DrOct 20, 2025Installation of 25 concrete piers under slab foundation for foundation repairs and a pressed footer under the wing walls · 43 m away
- 6908 Vista Willow DrJul 13, 2026Double 50 gal gas water heaters swap - closet · 75 m away
- 6906 Vista Willow DrJul 1, 2025Install 5 ton american standard complete system · 83 m away
- 6920 Brentfield DrNov 10, 2025Gas line to pool heater · 85 m away
- 6905 Vista Willow DrSep 2, 2025Meter change · 90 m away
- 6904 Vista Willow DrSep 28, 2020Remove existing roof and install new roof · 91 m away
- 6936 Brentfield DrSep 8, 202525 ft gas line in yard repalcement · 91 m away
- 6917 Echo Bluff DrDec 19, 2025Replace 5 ton a/c equipment; using existing ductwork · 94 m away