6933 Vista Willow Dr
Dallas, TX 75248
6933 Vista Willow Dr: 3 projects on record
City of Dallas lists 3 filings across 3 projects at 6933 Vista Willow Dr, Dallas, TX 75248. The most recent, filed January 5, 2021, covers: “Install water heater”.
Compiled from City of Dallas records · updated Jan 5, 2021
- Projects
- 3
- 3 filings
- Latest filing
- Jan 5, 2021
- since Jan 5, 2021
- Largest scope
- —
- Listed value
- $4K
- partial · often understated
Permit & project history
3 projectsSources: City of Dallas
Questions about 6933 Vista Willow Dr
What is being built at 6933 Vista Willow Dr?
The latest filing (City of Dallas permit 2101053046, January 5, 2021) covers install water heater.
How many permits and filings does 6933 Vista Willow Dr have?
3 filings across 3 projects, from January 5, 2021 to January 5, 2021.
How much is the construction at 6933 Vista Willow Dr worth?
Permits at this address list about $4K in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 6933 Vista Willow Dr?
Yes. Nearby filings include 6929 Vista Willow Dr (complete rebuild of customer main emergency shutoff, Jul 10, 2026); 6936 Vista Willow Dr (installation of 25 concrete piers under slab foundation for foundation repairs and a pressed footer under the wing walls, Oct 20, 2025); 6927 Vista Willow Dr (install 6 pilings, Sep 28, 2026).
How do I get alerts for new permits at 6933 Vista Willow Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 6929 Vista Willow DrJul 10, 2026Complete rebuild of customer main emergency shutoff · 16 m away
- 6936 Vista Willow DrOct 20, 2025Installation of 25 concrete piers under slab foundation for foundation repairs and a pressed footer under the wing walls · 21 m away
- 6927 Vista Willow DrSep 28, 2026Install 6 pilings · 25 m away
- 6921 Vista Willow DrOct 29, 2025Work to include under slab tunnel excavation to gain access to the defective drain lines servicing the ****master bath toilet****.• the sanitary sewer system servicing these fixtures will be replaced below-grade via tunneling.• all new pipe installed will be schedule 40 pvc.• work will include excavation of one access pit at the ****east side of home through gate directly in line with the 3” vent stack visible from the side of home**** exterior wall of the home.• work will include up to 10 linear feet of under slab tunneling · 49 m away
- 6918 Vista Willow DrJun 23, 2026Electrical work for residential remodel · 59 m away
- 6936 Brentfield DrSep 8, 202525 ft gas line in yard repalcement · 83 m away
- 6927 Echo Bluff DrApr 15, 2026Install 6 pilings · 92 m away
- 6931 Echo Bluff DrSep 14, 2026Electrical re-wire · 93 m away
- 6933 Echo Bluff DrOct 30, 2026Nsfaa-fire damage repair no structural changes · 94 m away
- 6935 Brentfield DrMay 9, 2025Demolition and repour approach · 95 m away
- 6920 Brentfield DrNov 10, 2025Gas line to pool heater · 95 m away
- 6908 Vista Willow DrJul 13, 2026Double 50 gal gas water heaters swap - closet · 99 m away