6926 Middle Cove Dr
Dallas, TX 75248
Two-story home planned at 6926 Middle Cove Dr
City of Dallas records indicate a new two-story single-family home is planned at 6926 Middle Cove Dr, with the existing pool kept for reuse. The new-construction permit was filed September 22, 2025, after a demolition permit for the main house and foundation was filed September 17, 2025. Later permits cover plumbing, mechanical work and a front driveway and sidewalk.
Summarized from City of Dallas records · updated Sep 18, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Sep 18, 2026
- since Sep 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsDemolish main house and foundation. keep pool for reuse. plans for new build includes pool for reuse
Demolish main house and foundation. keep pool for reuse. plans for new build includes pool for reuse
City of Dallas permitResidential Demolition Permit
Sources: City of Dallas
Questions about 6926 Middle Cove Dr
What is being built at 6926 Middle Cove Dr?
A City of Dallas new-construction permit describes a two-story single-family residence. The permit, RES-NEW-25-000918, was filed September 22, 2025.
Is the existing pool at 6926 Middle Cove Dr being removed?
The demolition and new-construction permit descriptions say the existing pool is being kept for reuse.
What is being demolished at 6926 Middle Cove Dr?
A September 17, 2025, demolition permit describes removing the main house and foundation while keeping the pool. The permit number is RES-DEM-25-000461.
When was the new home permitted at 6926 Middle Cove Dr?
The new-construction permit was filed September 22, 2025. Related electrical, plumbing and mechanical permits followed between September 2025 and March 2026.
Are there permits for a driveway at 6926 Middle Cove Dr?
Yes. A City of Dallas permit filed September 18, 2026, covers a new front driveway approach and sidewalk. Its number is RES-DSW-26-000461.
What other work is listed for 6926 Middle Cove Dr?
Records include permits for electrical work, plumbing, two mechanical systems and ductwork, and a front driveway and sidewalk. The filings span September 2025 through September 2026.
Also being built nearby
All of 75248- 6922 Middle Cove DrJul 1, 2025Hvac replacement. install 5 ton gas horizontal complete system · 17 m away
- 6931 Middle Cove DrJan 7, 2021Upgrade existing electrical service · 21 m away
- 6918 Middle Cove DrJan 18, 2021Install water heater · 34 m away
- 6919 Middle Cove DrMar 9, 2026Install 1 50 gallon gas water heater located in the garage closet · 35 m away
- 6915 Middle Cove DrSep 26, 2025New construction · 50 m away
- 6912 Middle Cove DrMay 18, 2026Installing a 3 ton in the master · 60 m away
- 6911 Middle Cove DrApr 25, 2026Relocating panel outside with new meter base · 65 m away
- 6909 Middle Cove DrNov 10, 2025Gas test for gas release · 71 m away
- 6947 Mill Falls DrOct 23, 2026New construction plumbing · 81 m away
- 6945 Mill Falls DrFeb 17, 20266945 mill falls install 22 concrete pilings to stabilize foundation · 83 m away
- 6943 Mill Falls DrDec 3, 2025Foundation repair · 86 m away
- 6935 Mill Falls DrApr 1, 2026Installing 2 new complete gas systems and ductwork · 101 m away