6931 Middle Cove Dr
Dallas, TX 75248
6931 Middle Cove Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 6931 Middle Cove Dr, Dallas, TX 75248. The most recent, filed January 7, 2021, covers: “Upgrade existing electrical service”.
Compiled from City of Dallas records · updated Jan 7, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 7, 2021
- since Jan 7, 2021
- Largest scope
- —
- Listed value
- $43
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 6931 Middle Cove Dr
What is being built at 6931 Middle Cove Dr?
The latest filing (City of Dallas permit 2101073029, January 7, 2021) covers upgrade existing electrical service.
How many permits and filings does 6931 Middle Cove Dr have?
1 filing across 1 project, from January 7, 2021 to January 7, 2021.
How much is the construction at 6931 Middle Cove Dr worth?
Permits at this address list about $43 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 6931 Middle Cove Dr?
Yes. Nearby filings include 6926 Middle Cove Dr (new front driveway and sidewalk. new construction home with front driveway approach, Sep 18, 2026); 6922 Middle Cove Dr (hvac replacement. install 5 ton gas horizontal complete system, Jul 1, 2025); 6919 Middle Cove Dr (install 1 50 gallon gas water heater located in the garage closet, Mar 9, 2026).
How do I get alerts for new permits at 6931 Middle Cove Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 6926 Middle Cove DrSep 18, 2026New front driveway and sidewalk. new construction home with front driveway approach · 21 m away
- 6922 Middle Cove DrJul 1, 2025Hvac replacement. install 5 ton gas horizontal complete system · 36 m away
- 6919 Middle Cove DrMar 9, 2026Install 1 50 gallon gas water heater located in the garage closet · 49 m away
- 6918 Middle Cove DrJan 18, 2021Install water heater · 52 m away
- 6915 Middle Cove DrSep 26, 2025New construction · 64 m away
- 6912 Middle Cove DrMay 18, 2026Installing a 3 ton in the master · 76 m away
- 6911 Middle Cove DrApr 25, 2026Relocating panel outside with new meter base · 77 m away
- 6909 Middle Cove DrNov 10, 2025Gas test for gas release · 83 m away
- 6947 Mill Falls DrOct 23, 2026New construction plumbing · 97 m away
- 6945 Mill Falls DrFeb 17, 20266945 mill falls install 22 concrete pilings to stabilize foundation · 101 m away
- 6943 Mill Falls DrDec 3, 2025Foundation repair · 105 m away
- 4825 Meadowcreek DrJun 3, 2026Nsfaa remove existing deck and posts that were severely damaged from flooding. install all new posts and framing for newly designed deck layout. framing details include:8 4x4steel posts (.25” thickness) set 4’ deep in 10’x18” concrete piers.these posts will also be supporting the gabled patio cover above deck. 6×6 pressure treated posts for covered deck (set 3’ deep in 8” diameter concrete ), 4x4 pressure treated posts set 8' or less on center, (set 3’ deep in 8” diameter concrete) for remaining deck areas2×8 ledger boards to existing concrete retaining wall. 2 2×8's sandwiched to create a 4×8 for beam support. this beam will-support 2x8 joist. 2×8 joist spaced 16" on center for deck frametrex deck boards for surface area.build covered gable patio cover over new deck. framing details include:5 4x10 steel beams set on 8 4x4 steel posts- welded together. 4x4 steel brackets at each post/ beam intersection- welded together4x4 steel vertical supports welded to steel beams to hold reach beam4x8 cedar reach beam 2x6 white wood rafters set 16” o.c to support new asphalt shingle roofbuild small gable patio cover intersecting into larger gable that attaches to back of house with ledger board 2 2x4 pressure treated boards sandwiched together and attached to house to make 4x8 posts3 4x8 cedar beams that sit on 2 steel posts and 2 cedar posts at house. 2x6 white wood rafters set 16” o.c to support new asphalt shingle roofpine tongue and groove for all ceilingsiron fenceremove existing fence and add on for new deck additions: 2x2 black posts with a 4x4 plate anchor into deck frame 3 feet tall wrought iron fence panels1" top& bottom tubing5/8" vertical picketspowder coated black finish2 self closing walk gate · 109 m away