7321 Rustic Valley Dr
Dallas, TX 75248
7321 Rustic Valley Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 7321 Rustic Valley Dr, Dallas, TX 75248. The most recent, filed August 11, 2025, covers: “5 ton evap coil and condenser”.
Compiled from City of Dallas records · updated Aug 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 11, 2025
- since Aug 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7321 Rustic Valley Dr
What is being built at 7321 Rustic Valley Dr?
The latest filing (City of Dallas permit RES-MEC-25-001812, August 11, 2025) covers 5 ton evap coil and condenser.
How many permits and filings does 7321 Rustic Valley Dr have?
1 filing across 1 project, from August 11, 2025 to August 11, 2025.
Is there other construction near 7321 Rustic Valley Dr?
Yes. Nearby filings include 7326 Rustic Valley Dr (excavation of an access pit at the clean outs in the front flower bed of the home. afteraccess pit is dug, a tunnel will excavated under the home approximately 40ft followingthe 3” pvc drain/sewer line exposing the defective areas on the drain/sewer line.after tunnel is excavated the defective areas of piping will be removed and repairedwith new pvc. after repair is made support hangers will be installed on thedrain/sewer line every 4-5ft, Sep 30, 2026); 7333 Rustic Valley Dr (sewer line replacement under the home as well as the sewer line in front of home, Nov 16, 2026); 7307 Rustic Valley Dr (50 gallon gas install in hallway closet, May 5, 2026).
How do I get alerts for new permits at 7321 Rustic Valley Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 7326 Rustic Valley DrSep 30, 2026Excavation of an access pit at the clean outs in the front flower bed of the home. afteraccess pit is dug, a tunnel will excavated under the home approximately 40ft followingthe 3” pvc drain/sewer line exposing the defective areas on the drain/sewer line.after tunnel is excavated the defective areas of piping will be removed and repairedwith new pvc. after repair is made support hangers will be installed on thedrain/sewer line every 4-5ft · 15 m away
- 7333 Rustic Valley DrNov 16, 2026Sewer line replacement under the home as well as the sewer line in front of home · 17 m away
- 7307 Rustic Valley DrMay 5, 202650 gallon gas install in hallway closet · 20 m away
- 7302 Rustic Valley DrNov 6, 2026Install 8 steel pipe piers plus 6 additional,, optional, steel pipe piers · 29 m away
- 7344 Rustic Valley DrSep 3, 2026Install 50 gallon gas water heater in hallway closet (swap out) · 37 m away
- 7314 Brentfield DrDec 8, 202550 gallon gas water heater · 90 m away
- 7401 Rustic Valley DrOct 21, 2026Floor plug and island electrical · 115 m away
- 7338 Brentfield DrMar 19, 2026Gas test · 115 m away
- 7239 Rustic Valley DrNov 26, 2025Solar system with battery · 118 m away
- 7238 Rustic Valley DrNov 18, 2026We are adding 6 piers to the southwest area of the home to lift the foundation · 118 m away
- 7402 Rustic Valley DrOct 24, 2020Foundation repair · 119 m away
- 7232 Rustic Valley DrDec 2, 2020Repair and or install backflow device · 127 m away