7402 Rustic Valley Dr
Dallas, TX 75248
7402 Rustic Valley Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 7402 Rustic Valley Dr, Dallas, TX 75248. The most recent, filed October 24, 2020, covers: “Foundation repair”.
Compiled from City of Dallas records · updated Oct 24, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 24, 2020
- since Oct 24, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7402 Rustic Valley Dr
What is being built at 7402 Rustic Valley Dr?
The latest filing (City of Dallas permit 2010211085, October 24, 2020) covers foundation repair.
How many permits and filings does 7402 Rustic Valley Dr have?
1 filing across 1 project, from October 24, 2020 to October 24, 2020.
Is there other construction near 7402 Rustic Valley Dr?
Yes. Nearby filings include 7401 Rustic Valley Dr (floor plug and island electrical, Oct 21, 2026); 7344 Rustic Valley Dr (install 50 gallon gas water heater in hallway closet (swap out), Sep 3, 2026); 7333 Rustic Valley Dr (sewer line replacement under the home as well as the sewer line in front of home, Nov 16, 2026).
How do I get alerts for new permits at 7402 Rustic Valley Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 7401 Rustic Valley DrOct 21, 2026Floor plug and island electrical · 13 m away
- 7344 Rustic Valley DrSep 3, 2026Install 50 gallon gas water heater in hallway closet (swap out) · 84 m away
- 7333 Rustic Valley DrNov 16, 2026Sewer line replacement under the home as well as the sewer line in front of home · 102 m away
- 7338 Brentfield DrMar 19, 2026Gas test · 105 m away
- 7407 Carta Valley DrFeb 17, 202615 ft tunnel to repair water leak · 106 m away
- 7326 Rustic Valley DrSep 30, 2026Excavation of an access pit at the clean outs in the front flower bed of the home. afteraccess pit is dug, a tunnel will excavated under the home approximately 40ft followingthe 3” pvc drain/sewer line exposing the defective areas on the drain/sewer line.after tunnel is excavated the defective areas of piping will be removed and repairedwith new pvc. after repair is made support hangers will be installed on thedrain/sewer line every 4-5ft · 109 m away
- 7416 Carta Valley DrOct 6, 2020Install water heater · 116 m away
- 7412 Carta Valley DrOct 1, 20267412 carta valley install 10 concrete pilings to stabilize foundation · 117 m away
- 7408 Carta Valley DrJun 9, 2025Updated main panel box to 200amps and meter base · 117 m away
- 7321 Rustic Valley DrAug 11, 20255 ton evap coil and condenser · 119 m away
- 7404 Carta Valley DrSep 23, 2026Complete roof replacement with new asphalt shingles, underlayment, flashing, drip edge, ventilation components, roof penetration waterproofing, and associated materials necessary to provide a complete and weather-resistant roofing system · 119 m away
- 7314 Brentfield DrDec 8, 202550 gallon gas water heater · 128 m away