7414 Chattington Dr
Dallas, TX 75248
7414 Chattington Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 7414 Chattington Dr, Dallas, TX 75248. The most recent, filed November 13, 2020, covers: “Foundation repair”.
Compiled from City of Dallas records · updated Nov 13, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 13, 2020
- since Nov 13, 2020
- Largest scope
- —
- Listed value
- $395
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 7414 Chattington Dr
What is being built at 7414 Chattington Dr?
The latest filing (City of Dallas permit 2011136006, November 13, 2020) covers foundation repair.
How many permits and filings does 7414 Chattington Dr have?
1 filing across 1 project, from November 13, 2020 to November 13, 2020.
How much is the construction at 7414 Chattington Dr worth?
Permits at this address list about $395 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 7414 Chattington Dr?
Yes. Nearby filings include 7432 Chattington Dr (install 40 gallon gas water heater (swap out), Sep 28, 2026); 7438 Chattington Dr (install 40 gallon gas water heater in water closet (swap out), Nov 11, 2026); 7403 Chattington Dr (installed complete hvac system, Oct 6, 2025).
How do I get alerts for new permits at 7414 Chattington Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75248- 7432 Chattington DrSep 28, 2026Install 40 gallon gas water heater (swap out) · 37 m away
- 7438 Chattington DrNov 11, 2026Install 40 gallon gas water heater in water closet (swap out) · 49 m away
- 7403 Chattington DrOct 6, 2025Installed complete hvac system · 74 m away
- 7425 Lynworth DrApr 24, 20265 ton deluxe 80% gas system – horizontal · 78 m away
- 7443 Lynworth DrMar 2, 2026Meter base upgrade · 101 m away
- 7444 Lynworth DrOct 20, 20261. make accesses in the kitchen, laundry, master bathroom, hall bathroom and front clean outs and tunnel 130’ to replace the existing cast iron with schedule 40 pvc pipe under the existing slab for the master bathroom and (2) hall bathrooms, ac hub drain, powder room, bar sink, laundry room and kitchen to the double clean outs in front of the house.2. remove (4) water closets to replace flanges and reinstall.3. replace the existing tub drain with a new pvc drain.4. hand dig 30’ from the laundry room to the kitchen from the outside to connect to the kitchen drain to the new drain line.5. anchor plumbing to structural beams as per code · 113 m away
- 7411 Tophill LnJul 21, 202560 ft tunnel sewer line repair/replacement · 161 m away
- 7419 Tophill LnJun 25, 2026To replace x1 50 gal gas water heater in the garage · 164 m away
- 7425 Tophill LnAug 19, 2026Update grounding system 2 8ft grounding system meter base and disconnectpermits and inspectionsultra surge and lightning protection · 168 m away
- 15105 Meandering PlNov 12, 2026Repair gas line · 177 m away
- 7420 Tophill LnAug 3, 2026Water heater install · 178 m away
- 7437 Tophill LnJan 6, 2026Cast iron piping replacement under slab · 181 m away