7630 Arapaho Rd
Dallas, TX 75248 · Richardson ISD
New 200,000-square-foot middle school planned on Arapaho Road
Permit records indicate a new, approximately 200,000-square-foot middle school is being built at 7630 Arapaho Road for Richardson ISD. The first filing was March 6, 2026; later records describe a three-story school with 55 classrooms, two gymnasiums, a storm shelter, a football field and a four-lane track. The applicant's estimated project cost is $120 million.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 27, 2026
- Projects
- 29
- 29 filings
- Latest filing
- Oct 27, 2026
- since Mar 6, 2026
- Largest scope
- 200,000 sf
- Estimated cost
- $120M
- state registration
Permit & project history
29 projectsNew construction 3-story middle school. the mechanical scope includes chillers, ahu's, rtu's, vav's, boilers, and pumps
New construction 3-story middle school. the mechanical scope includes chillers, ahu's, rtu's, vav's, boilers, and pumps
City of Dallas permitCommercial Mechanical PermitDsst-risd westwood ms gymnasiums. this project is a newly constructed middle school for risd. it includes a 3 story academic portion which has 55 total classrooms as well as 2 gymnasiums and a storm shelter. the site will include a football field with a 4 lane track, 4 tennis courts and outdoor learning areas
Dsst-risd westwood ms gymnasiums. this project is a newly constructed middle school for risd. it includes a 3 story academic portion which has 55 total classrooms as well as 2 gymnasiums and a storm shelter. the site will include a football field with a 4 lane track, 4 tennis courts and outdoor learning areas
City of Dallas permitPhase - New ConstructionNew construction 3-story middle school. the plumbing scope includes gas, domestic water, sanitary sewer, storm piping, acid waste piping
New construction 3-story middle school. the plumbing scope includes gas, domestic water, sanitary sewer, storm piping, acid waste piping
City of Dallas permitCommercial Plumbing PermitDsst-risd westwood ms first floor b this project is a newly constructed middle school for risd. it includes a 3 story academic portion which has 55 total classrooms as well as 2 gymnasiums and a storm shelter. the site will include a football field with a 4 lane track, 4 tennis courts and outdoor learning areas
Dsst-risd westwood ms first floor b this project is a newly constructed middle school for risd. it includes a 3 story academic portion which has 55 total classrooms as well as 2 gymnasiums and a storm shelter. the site will include a football field with a 4 lane track, 4 tennis courts and outdoor learning areas
City of Dallas permitPhase - New ConstructionDsst-risd westwood ms 2nd floor classrooms b this project is a newly constructed middle school for risd. it includes a 3 story academic portion which has 55 total classrooms as well as 2 gymnasiums and a storm shelter. the site will include a football field with a 4 lane track, 4 tennis courts and outdoor learning areas
Dsst-risd westwood ms 2nd floor classrooms b this project is a newly constructed middle school for risd. it includes a 3 story academic portion which has 55 total classrooms as well as 2 gymnasiums and a storm shelter. the site will include a football field with a 4 lane track, 4 tennis courts and outdoor learning areas
City of Dallas permitPhase - New ConstructionDsst-risd westwood ms level 3 b this project is a newly constructed middle school for risd. it includes a 3 story academic portion which has 55 total classrooms as well as 2 gymnasiums and a storm shelter. the site will include a football field with a 4 lane track, 4 tennis courts and outdoor learning areas
Dsst-risd westwood ms level 3 b this project is a newly constructed middle school for risd. it includes a 3 story academic portion which has 55 total classrooms as well as 2 gymnasiums and a storm shelter. the site will include a football field with a 4 lane track, 4 tennis courts and outdoor learning areas
City of Dallas permitPhase - New Construction4" domestic water line (120'). 3/4" domestic water line (560'). 8", 6" , and 4" sanitary sewer (270'). sanitary sewer manholes (3), sanitary sewer lift station (1). 6005' of storm drain varying from 30" rcp and down to" hdpe. trench drains (1160') and storm structures (43)
4" domestic water line (120'). 3/4" domestic water line (560'). 8", 6" , and 4" sanitary sewer (270'). sanitary sewer manholes (3), sanitary sewer lift station (1). 6005' of storm drain varying from 30" rcp and down to" hdpe. trench drains (1160') and storm structures (43)
City of Dallas permitCommercial Plumbing PermitDsst-risd westwood ms this project is a newly constructed middle school for risd. it includes a 3 story academic portion which has 55 total classrooms as well as 2 gymnasiums and a storm shelter. the site will include a football field with a 4 lane track, 4 tennis courts and outdoor learning areas
Dsst-risd westwood ms this project is a newly constructed middle school for risd. it includes a 3 story academic portion which has 55 total classrooms as well as 2 gymnasiums and a storm shelter. the site will include a football field with a 4 lane track, 4 tennis courts and outdoor learning areas
City of Dallas permitCommercial New Construction PermitApprox. 200,000 sq ft new middle school. — westwood junior high school
TDLR project registrationNew ConstructionProject Registered200,000 sq ft$120M est.- Project #
- TABS2026014382
- Tenant / owner
- Westwood Middle School
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 7630 Arapaho Rd
What is being built at 7630 Arapaho Road?
Permit records describe a new middle school for Richardson ISD, approximately 200,000 square feet. Plans include a three-story academic building, 55 classrooms, two gymnasiums and a storm shelter.
When was the middle school at 7630 Arapaho Road permitted?
The first filing in the records is dated March 6, 2026. Dallas permit activity continued through October 27, 2026.
How much will the new school on Arapaho Road cost?
The applicant's estimated cost for the project is $120 million. This is an estimate, not a final reported construction cost.
What features are planned for the new Westwood middle school?
Permit descriptions list 55 classrooms, two gymnasiums, a storm shelter, a football field with a four-lane track, four tennis courts and outdoor learning areas.
Is a new school being built near Chick-Fil-A #4409 Spanish Village?
Yes. The school project is at 7630 Arapaho Road, about 576 meters from Chick-Fil-A #4409 Spanish Village at 7934 Arapaho Road.
What do the Dallas permits say about construction at 7630 Arapaho Road?
Recent permits cover site work, mechanical and electrical systems, plumbing, and the school gymnasiums. A September 9, 2026, phase permit describes the new middle school and its planned site features.
Also being built nearby
All of 75248- 7636 La Risa DrJun 19, 2026Install 1 40 gal gas water heater in garage · 76 m away
- 7617 La Risa DrSep 18, 2026Sewer re-pipe and yard line · 88 m away
- 7611 La Risa DrSep 22, 2020Remodel existing plumbing · 92 m away
- 7521 La Avenida DrOct 1, 2025To replace x1 40 gal gas water heater in the hallway closet · 115 m away
- 7607 La Avenida DrOct 28, 2026Demolition of house · 186 m away
- 7716 La Risa DrApr 1, 2026Gas test gas release · 190 m away
- 7641 La Avenida DrMay 20, 2025Tear off shingles and install new laminate architectural shingles-reroof only - no layout changesno plan review requiredall subject to field inspectors’ approval.reroof only - no layout changesremove existing roof and install new roof.no structural changes allowed under this permit. fill cavity with insulation.persons performing solid waste/recycling collections including operating a vehicle transporting waste/recycling within the city of dallas are required to obtain a solid waste franchise from sanitation services. ordinance 18-32 states in part that handling solid waste within the city of dallas without a franchise is a violation of the city ordinance and may result in civil penalties of up to $2,000 for each violation. sanitation services is located at 3112 canton street, 2nd floor, dallas, texas 75226 · 199 m away
- 7706 El Santo LnAug 10, 2026Mcr with battery joel adair- installation of 7.395 kw pv system + 20 kwh energy storage system, and smart electrical panel 40 · 200 m away
- 7645 La Avenida DrNov 8, 202550 gallon gas with h in garage · 201 m away
- 7710 El Santo LnFeb 17, 2026Install new hvac system · 206 m away
- 7717 El Santo LnMay 15, 2026Replacing 50 gallon gas water heater in utility closet · 212 m away
- 7727 La Risa DrSep 9, 2026Remove and replace 3600 sq ft shingles and underlayment · 213 m away