7703 Applecross Ln
Dallas, TX 75248
Sewer repair permitted at 7703 Applecross Ln
A sewer repair by tunnel at this residential address was permitted by the City of Dallas on May 21, 2026, under permit RES-PLM-26-005276. A separate 2019 permit records an addition to a single-family home at the address.
Summarized from City of Dallas records · updated May 21, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 21, 2026
- since May 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 7703 Applecross Ln
What is being built at 7703 Applecross Ln?
City of Dallas records show a sewer repair by tunnel permitted on May 21, 2026. An earlier 2019 permit records an addition to a single-family home.
Is a new home being built at 7703 Applecross Ln?
The records provided do not show a new-home permit. They show a sewer repair permit from May 21, 2026, and a 2019 permit for an addition to a single-family home.
What does the permit at 7703 Applecross Ln cover?
Permit RES-PLM-26-005276 describes a residential plumbing project to repair the sewer by tunnel. It was filed with the City of Dallas on May 21, 2026.
When was the sewer repair permit filed at 7703 Applecross Ln?
The City of Dallas permit was filed on May 21, 2026. Its permit number is RES-PLM-26-005276.
Was there an earlier addition at 7703 Applecross Ln?
Yes. A City of Dallas building permit dated November 4, 2019, describes an addition to a single-family home. The permit number is 1910311011.
Also being built nearby
All of 75248- 7701 Applecross LnOct 21, 2026Remove existing circular drive, 2 approach ramps, 2 sidewalk sections. repour approach ramps, 3500 psi concrete, 6" thick, #4 rebar 12" o.c. ew repour driveway, approx. 2200 sq ft, 4" thick, 3500psi concrete smooth finish, #3 rebar 15" ocew, maintain 2" per 1' drainage slope, outer 1ft of driveway to be stamped concrete.re pour 2 sidewalk section 4" thick, 3500 psi concrete, stamped concrete, #3 rebar 15" ocew, location of all new concrete to match existing · 42 m away
- 7802 Glenneagle DrDec 31, 2025Replace 2 gas tank water heater · 45 m away
- 7804 Glenneagle DrJun 1, 2026Sewer replacement via trench and tunnel including the laundry riser · 50 m away
- 7807 Glenneagle DrApr 1, 2026Gas test for meter release · 65 m away
- 7812 Glenneagle DrSep 17, 2026Installing 8 total piers · 74 m away
- 7811 Glenneagle DrApr 20, 2026Driveway and approach will be both removed and replaced with new concrete we will be braking apart and hauling away concrete to a dump site " big city crushed concrete" we will also be regrading and making sure all grade is how its supposed to be as plans and all rebar is to specs and placed properly before pouring as well as forms making sure all forms are set to proper elevation also we will adding proper base rock for base and making sure its properly compacted · 76 m away
- 7815 Glenneagle DrFeb 6, 2026Sewer repair · 88 m away
- 16212 Spring Creek RdJul 22, 2026-demolish and remove approximately 35 linear feet (lf) of existing city curb to install a new residential driveway approach.-demolish and remove approximately 5' x 35' of existing city sidewalk and reconstruct it as part of the new driveway approach in accordance with city of dallas standards.-demolish and replace the existing front residential concrete walkway, approximately 5' x 31', matching the new concrete improvements.-construct a new reinforced concrete driveway, approximately 30' x 25', aligned with the new curb cut and driveway approach.-the front yard is approximately 3,100 square feet,there is a tree there but it will not be touched at all. everything that is modified is 5feet or more away · 101 m away
- 16210 Spring Creek RdAug 26, 2026Install 25 piers · 103 m away
- 16208 Spring Creek RdNov 3, 2020Foundation repair · 114 m away
- 7710 Lairds LnDec 15, 2025Tunnel under slab up to 5 feet to repair leak on water line · 131 m away
- 7826 Glenneagle DrFeb 20, 2026X2 50 gal gas water heaters right side hall · 132 m away