17817 Hillcrest Rd
Dallas, TX 75252
Interior renovation permits filed for First Chinese Baptist Church
A permit filed August 11, 2026, describes interior renovations at First Chinese Baptist Church of Dallas, including work in the sanctuary, classrooms, and storage areas. The work is planned within the existing building. Additional permits filed in September cover an HVAC upgrade and electrical work.
Summarized from City of Dallas records · updated Sep 22, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Sep 22, 2026
- since Oct 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsBu zo the project consists of the interior renovation of the first chinese baptist church of dallas. the work includes renovating the sanctuary stage, a/v room, sound booth, classrooms, and storage areas. the project also includes new walls, doors, ceilings, flooring, lighting, hvac upgrades, electrical improvements, and life safety modifications. all work will be completed within the existing building and coordinated with the owner's operations while complying with current building codes and permit requirements
Bu zo the project consists of the interior renovation of the first chinese baptist church of dallas. the work includes renovating the sanctuary stage, a/v room, sound booth, classrooms, and storage areas. the project also includes new walls, doors, ceilings, flooring, lighting, hvac upgrades, electrical improvements, and life safety modifications. all work will be completed within the existing building and coordinated with the owner's operations while complying with current building codes and permit requirements
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 17817 Hillcrest Rd
What is being built at 17817 Hillcrest Road?
Permits indicate interior renovations to the existing First Chinese Baptist Church of Dallas, not a new building. The described work includes updates to the sanctuary stage, A/V room, sound booth, classrooms, and storage areas.
Is a new church being built at 17817 Hillcrest Road?
The August 11, 2026, permit describes renovation work within the existing building. It does not describe construction of a new church.
What parts of First Chinese Baptist Church are being renovated?
The permit description lists the sanctuary stage, A/V room, sound booth, classrooms, and storage areas, along with updates to walls, doors, ceilings, flooring, lighting, HVAC, electrical systems, and life safety features.
When were the renovation permits filed for First Chinese Baptist Church of Dallas?
The commercial alteration permit, COM-ALT-ADD-26-001658, was filed August 11, 2026. An HVAC permit followed on September 1, and an electrical permit was filed September 22, 2026.
What electrical work is planned at 17817 Hillcrest Road?
Permit COM-ELC-26-004749, filed September 22, 2026, describes adding a subpanel and updating lighting. A separate permit filed October 2, 2025, covered replacement of an electrical panel.
Also being built nearby
All of 75252- 17817 Hillcrest Road · First Chinese Baptist Church DallasJul 10, 2026First chinese baptist church dallas — renovation/alteration — interior renovation of existing gymnasium for worship, adding a stage area, new flooring, lighting upgrade, and sound booth
- 17806 Hillcrest RdAug 19, 2026Replacing gas riser to house · 41 m away
- 17810 Hillcrest RdNov 5, 2025Remove existing fence and install new fence in the same location for a total of 140 · 68 m away
- 17822 Hillcrest RdMar 7, 2026Remodel plumbing inside · 104 m away
- 7008 Judi StNov 6, 2026Install 49 total pilings · 189 m away
- 7015 Judi StMay 20, 2025Replacement of existing fence. extension of the fence slide gate motorized · 207 m away
- 6808 Gold Dust TrlOct 16, 2025Installation of mainline sewer yard service and two-way cleanouts · 221 m away
- 7023 Judi StMar 25, 2026Connecting a gas generator · 222 m away
- 7130 Debbe DrSep 1, 2026Home owner gas locked off, homeowner requested i perform gas pressure test for permit and inspection report. pressure test is holding, no repairs were made by me. scope change: amd-scope-26-001539 replacing section of gas piping in garage, currently ran down escterior of wall in flex line, will be running it in wall in steel piping · 228 m away
- 6804 Gold Dust TrlOct 23, 2025No duct work · 230 m away
- 7005 Lattimore DrJun 19, 202650 gall gas garage closet · 232 m away
- 7032 Judi StSep 11, 2025Remove and replace wh · 235 m away
More churches & places of worship in 75252, warehouses & industrial in 75252.