6808 Gold Dust Trl
Dallas, TX 75252
Sewer service and cleanouts permitted at 6808 Gold Dust Trl
A residential plumbing permit indicates installation of mainline sewer yard service and two-way cleanouts at 6808 Gold Dust Trl. The City of Dallas permit was filed on October 16, 2025, under permit number RES-PLM-25-006157.
Summarized from City of Dallas records · updated Oct 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 16, 2025
- since Oct 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6808 Gold Dust Trl
What is being built at 6808 Gold Dust Trl?
A City of Dallas residential plumbing permit indicates mainline sewer yard service and two-way cleanouts will be installed. The permit was filed October 16, 2025, under RES-PLM-25-006157.
What work is planned at 6808 Gold Dust Trl in Dallas?
The permit describes installation of mainline sewer yard service and two-way cleanouts. It does not specify other work.
When was the sewer work at 6808 Gold Dust Trl permitted?
The City of Dallas filed the residential plumbing permit on October 16, 2025. Its number is RES-PLM-25-006157.
Is a new home being built at 6808 Gold Dust Trl?
The available record is for plumbing work, not a new-home construction permit. It describes mainline sewer yard service and two-way cleanouts.
What is planned near First Chinese Baptist Church Dallas?
A residential plumbing permit at 6808 Gold Dust Trl describes installation of mainline sewer yard service and two-way cleanouts. The address is listed 221 meters from First Chinese Baptist Church Dallas.
What does permit RES-PLM-25-006157 cover?
The City of Dallas permit covers installation of mainline sewer yard service and two-way cleanouts at 6808 Gold Dust Trl. It was filed October 16, 2025.
Also being built nearby
All of 75252- 6804 Gold Dust TrlOct 23, 2025No duct work · 10 m away
- 6801 Hyacinth LnJun 20, 2025Hvac replacement · 96 m away
- 6806 Hyacinth LnJun 12, 2026Mcr with battery 3rd party approved installation of a 49 modules - roofmounted - 20.090 kw dc, 15.200 kw ac with 2 tesla powerwall 3 battery and a 200a mpu · 107 m away
- 6802 Hyacinth LnOct 16, 2025Foundation repair-adjust 7 existing pilings · 108 m away
- 6818 Hyacinth LnJun 29, 20261 50 gallon gas installed in garage1 40 gallon gas installed in 1st floor pull down attic · 110 m away
- 6728 Gold Dust TrlNov 1, 202650 gal water heater replacement · 195 m away
- 6729 Hyacinth LnJan 22, 2026Electrical for addition (bedroom and patio) · 216 m away
- 6719 Gold Dust TrlOct 30, 2025Hvac add · 219 m away
- 6727 Hyacinth LnDec 30, 2025Install rinnai 11.1 gas tankless water heater in attic · 220 m away
- 17817 Hillcrest Road · First Chinese Baptist Church DallasJul 10, 2026First chinese baptist church dallas — renovation/alteration — interior renovation of existing gymnasium for worship, adding a stage area, new flooring, lighting upgrade, and sound booth · 221 m away
- 17817 Hillcrest RdSep 22, 2026Add a subpanel and update lighting · 221 m away
- 6716 Gold Dust TrlDec 12, 2025Replace 5 ton heat pump 17 seer inverter system · 224 m away