18140 Meandering Way
Dallas, TX 75252
18140 Meandering Way: 1 project on record
City of Dallas lists 1 filing across 1 project at 18140 Meandering Way, Dallas, TX 75252. The most recent, filed July 3, 2025, covers: “Hvac replacement”.
Compiled from City of Dallas records · updated Jul 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 3, 2025
- since Jul 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 18140 Meandering Way
What is being built at 18140 Meandering Way?
The latest filing (City of Dallas permit RES-MEC-25-001088, July 3, 2025) covers hvac replacement.
How many permits and filings does 18140 Meandering Way have?
1 filing across 1 project, from July 3, 2025 to July 3, 2025.
Is there other construction near 18140 Meandering Way?
Yes. Nearby filings include 18144 Meandering Way (install 50 gallon gas water heater in attic (swap out), May 7, 2026); 18128 Meandering Way (remove existing roof and replace it with new certainteed class 4 shingle in colonial slate color choice, Jul 19, 2025); 7042 Spruce Creek Ln (single layer re roof comp shingles, Sep 29, 2025).
How do I get alerts for new permits at 18140 Meandering Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75252- 18144 Meandering WayMay 7, 2026Install 50 gallon gas water heater in attic (swap out) · 5 m away
- 18128 Meandering WayJul 19, 2025Remove existing roof and replace it with new certainteed class 4 shingle in colonial slate color choice · 14 m away
- 7042 Spruce Creek LnSep 29, 2025Single layer re roof comp shingles · 81 m away
- 7018 Spruce Creek LnMay 15, 2025Gas complete like for like · 102 m away
- 18231 Meandering WayApr 27, 2026Replace dbl check for sprinkler sys · 102 m away
- 18239 Meandering WayOct 14, 2026Replacing 2 50 gal water heaters · 116 m away
- 7129 Pecan Creek LnJul 14, 2025Installing gm level 2 charger and v2h bi-directional charging bundle60amp circuit · 120 m away
- 7112 Aspen Creek LnNov 18, 202550 gallon gas water heater · 128 m away
- 7106 Aspen Creek LnJul 30, 2026Install 8 pilings · 128 m away
- 6946 Aspen Creek LnMay 11, 2026Replacing 4 ton gas complete system · 132 m away
- 18242 Meandering WayNov 26, 2025Replacing one 50 gal water heater · 141 m away
- 6990 Aspen Creek LnSep 16, 2026Dedicated 60-amp ev charging circuit installation** install a dedicated 60-amp circuit from the electrical panel for the customer-supplied wall-station charging unit. includes square d qo-compatible breaker/materials, installation, connections, testing, and verification · 144 m away