Recent · latest filing Jul 2026Residential
7106 Aspen Creek Ln
Dallas, TX 75252
Foundation repair permit for 8 pilings at 7106 Aspen Creek Ln
A City of Dallas permit indicates foundation repair work to install 8 pilings at 7106 Aspen Creek Ln. The permit, RES-FDN-26-000612, was filed on July 30, 2026.
Summarized from City of Dallas records · updated Jul 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 30, 2026
- since Jul 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7106 Aspen Creek Ln
What work is permitted at 7106 Aspen Creek Ln?
A City of Dallas permit indicates installation of 8 pilings for residential foundation repair.
When was the foundation repair permit filed?
The permit was filed on July 30, 2026.
What is the permit number for 7106 Aspen Creek Ln?
The City of Dallas permit number is RES-FDN-26-000612.
Is a new home being built at 7106 Aspen Creek Ln?
The record describes residential foundation repair to install 8 pilings; it does not indicate construction of a new home.
How many pilings are included in the 7106 Aspen Creek Ln permit?
The permit description specifies 8 pilings.
Also being built nearby
All of 75252- 7112 Aspen Creek LnNov 18, 202550 gallon gas water heater · 2 m away
- 7049 Aspen Creek LnMay 18, 202650 gal gas heater in garage closet · 108 m away
- 7042 Spruce Creek LnSep 29, 2025Single layer re roof comp shingles · 113 m away
- 18128 Meandering WayJul 19, 2025Remove existing roof and replace it with new certainteed class 4 shingle in colonial slate color choice · 113 m away
- 7107 Mumford CtJul 16, 2025B/r unit · 114 m away
- 7116 Mumford CtSep 16, 2025Gas line repair for 26kw generator · 127 m away
- 18140 Meandering WayJul 3, 2025Hvac replacement · 128 m away
- 7018 Spruce Creek LnMay 15, 2025Gas complete like for like · 129 m away
- 7006 Aspen Creek LnOct 1, 2025Re-roof · 130 m away
- 18144 Meandering WayMay 7, 2026Install 50 gallon gas water heater in attic (swap out) · 132 m away
- 6990 Aspen Creek LnSep 16, 2026Dedicated 60-amp ev charging circuit installation** install a dedicated 60-amp circuit from the electrical panel for the customer-supplied wall-station charging unit. includes square d qo-compatible breaker/materials, installation, connections, testing, and verification · 137 m away
- 6946 Aspen Creek LnMay 11, 2026Replacing 4 ton gas complete system · 190 m away