5952 Still Forest Dr
Dallas, TX 75252
Water heater and HVAC work permitted at 5952 Still Forest Dr
City of Dallas permits indicate residential plumbing and HVAC replacement work at 5952 Still Forest Dr, rather than a new building project. The HVAC permit was filed October 6, 2025, and the water heater permit followed on October 10, 2025.
Summarized from City of Dallas records · updated Oct 10, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 10, 2025
- since Oct 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 5952 Still Forest Dr
What work is happening at 5952 Still Forest Dr?
City of Dallas records list replacement of two HVAC coil/condenser units and a 50-gallon electric water heater. The permits were filed October 6 and October 10, 2025.
Is a new house being built at 5952 Still Forest Dr?
The records provided show residential mechanical and plumbing permits, not a new-home construction permit.
What does permit RES-MEC-25-002974 cover?
The October 6, 2025, City of Dallas mechanical permit describes replacing one 4-ton coil condenser and one 3-ton coil condenser.
What does permit RES-PLM-25-005934 cover?
The October 10, 2025, City of Dallas plumbing permit is for a 50-gallon electric water heater.
When were the permits filed for work at 5952 Still Forest Dr?
The HVAC permit, RES-MEC-25-002974, was filed October 6, 2025. The water heater permit, RES-PLM-25-005934, was filed October 10, 2025.
Also being built nearby
All of 75252- 5940 Still Forest DrAug 27, 2026Replace old hvac condenser, evaporator coil and gas furnace including ducts · 20 m away
- 5937 Still Forest DrJul 13, 2026Replace 50 gal electric water heater in garage · 30 m away
- 5928 Still Forest DrJul 19, 2026Replace 1- 2 ton complete hvac system · 40 m away
- 5920 Still Forest DrJan 8, 2026Hvac changeout; change 2 ton outdoor condenser and indoor matching evaporator coil. install new s40 thermostat in place of existing s30. no structural change · 54 m away
- 5932 Fallsview LnAug 17, 2026Install (2) new hvac systems · 87 m away
- 5924 Fallsview LnNov 19, 2025200 amp panel and meter base · 90 m away
- 6008 Still Forest DrMay 13, 2026Extended drain line from water heater · 94 m away
- 5922 Glen Heather DrMay 6, 2026Gas test · 102 m away
- 6036 Still Forest DrFeb 16, 2026Run new gas line to on demand generator · 142 m away
- 6012 Fallsview LnSep 4, 2025Whole system gas piping air test · 156 m away
- 6009 Fallsview LnFeb 23, 2026Estimate detailsnew supply and return plenumsnew disconnect and whipnew concrete pad, leveledmanual dampers on all supply connections to the supply plenummodify supply ducting best air delivery, including replacing the supply runs with boots/grilles in bed1and bed2abandon wall returns and install 4 new returns: masterbed, bed1, bed2 and living or diningcity permitnew drain pan with safety float switchflush line setpressurize and vacuum line set prior to releasing refrigerantcharge system to manufacture’s specificationsreconnect to existing copper, electrical and primary drain line · 158 m away
- 6020 Fallsview LnNov 14, 2025Up to 10 · 168 m away