6012 Fallsview Ln
Dallas, TX 75252
6012 Fallsview Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 6012 Fallsview Ln, Dallas, TX 75252. The most recent, filed September 4, 2025, covers: “Whole system gas piping air test”.
Compiled from City of Dallas records · updated Sep 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2025
- since Sep 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6012 Fallsview Ln
What is being built at 6012 Fallsview Ln?
The latest filing (City of Dallas permit RES-PLM-25-004438, September 4, 2025) covers whole system gas piping air test.
How many permits and filings does 6012 Fallsview Ln have?
1 filing across 1 project, from September 4, 2025 to September 4, 2025.
Is there other construction near 6012 Fallsview Ln?
Yes. Nearby filings include 6020 Fallsview Ln (up to 10, Nov 14, 2025); 6009 Fallsview Ln (estimate detailsnew supply and return plenumsnew disconnect and whipnew concrete pad, leveledmanual dampers on all supply connections to the supply plenummodify supply ducting best air delivery, including replacing the supply runs with boots/grilles in bed1and bed2abandon wall returns and install 4 new returns: masterbed, bed1, bed2 and living or diningcity permitnew drain pan with safety float switchflush line setpressurize and vacuum line set prior to releasing refrigerantcharge system to manufacture’s specificationsreconnect to existing copper, electrical and primary drain line, Feb 23, 2026); 6029 Fallsview Ln (installing 10 steel piles to prevent further downward movement of the slab, May 7, 2026).
How do I get alerts for new permits at 6012 Fallsview Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75252- 6020 Fallsview LnNov 14, 2025Up to 10 · 14 m away
- 6009 Fallsview LnFeb 23, 2026Estimate detailsnew supply and return plenumsnew disconnect and whipnew concrete pad, leveledmanual dampers on all supply connections to the supply plenummodify supply ducting best air delivery, including replacing the supply runs with boots/grilles in bed1and bed2abandon wall returns and install 4 new returns: masterbed, bed1, bed2 and living or diningcity permitnew drain pan with safety float switchflush line setpressurize and vacuum line set prior to releasing refrigerantcharge system to manufacture’s specificationsreconnect to existing copper, electrical and primary drain line · 14 m away
- 6029 Fallsview LnMay 7, 2026Installing 10 steel piles to prevent further downward movement of the slab · 31 m away
- 6036 Still Forest DrFeb 16, 2026Run new gas line to on demand generator · 87 m away
- 6008 Still Forest DrMay 13, 2026Extended drain line from water heater · 94 m away
- 6008 Richwater DrSep 25, 2026Install 5 pilings · 94 m away
- 5932 Fallsview LnAug 17, 2026Install (2) new hvac systems · 139 m away
- 17612 Windflower WayAug 14, 2026Replace 50 gallon gas water heater in garage · 150 m away
- 5924 Fallsview LnNov 19, 2025200 amp panel and meter base · 153 m away
- 5952 Still Forest DrOct 10, 202550 gal elec water heater · 156 m away
- 17624 Windflower WayNov 4, 202610 ft tunnel · 158 m away
- 17632 Windflower WayNov 14, 2025Roof replacement · 167 m away