Home permits cover battery storage, panel and plumbing work
Residential permits at 6632 Crestland Ave cover two Tesla Powerwall 3 batteries and a main panel upgrade, with filings dated September 30, 2025, and March 9–10, 2026. Other permits cover a main water line replacement and a sewer repair tunnel under the slab. The latest filing was for the sewer work on October 2, 2026.
Summarized from City of Dallas records · updated Oct 2, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Oct 2, 2026
- since Sep 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsMcr with batt(3rd) third party approved: installing 2 tesla pw3 batteries and a main panel upgrade
Mcr with batt(3rd) third party approved: installing 2 tesla pw3 batteries and a main panel upgrade
City of Dallas permitResidential Solar/PV Permit
Sources: City of Dallas
Questions about 6632 Crestland Ave
What work is permitted at 6632 Crestland Ave?
City of Dallas permits describe battery and electrical upgrades, a main water line replacement, and a sewer repair tunnel under the slab. The latest filing, for the sewer repair, was dated October 2, 2026.
Are Tesla Powerwall batteries being added at 6632 Crestland Ave?
Permits dated September 30, 2025, and March 9–10, 2026, describe installing two Tesla Powerwall 3 batteries and upgrading the main electrical panel. The records do not provide a completion date.
When was the sewer repair permit filed at 6632 Crestland Ave?
The City of Dallas issued a residential plumbing permit dated October 2, 2026, for a tunnel under the slab for sewer repair. The permit number is RES-PLM-26-010561.
Was a water line replacement permitted at 6632 Crestland Ave?
Yes. A City of Dallas residential plumbing permit dated September 30, 2025, describes replacing the main water line in the yard. The permit number is RES-PLM-25-005486.
When were the electrical permits filed for 6632 Crestland Ave?
The records include an electrical permit dated September 30, 2025, and another dated March 10, 2026. Both describe two Tesla Powerwall 3 batteries and a main panel upgrade.
Also being built nearby
All of 75252- 6635 Crestland AveNov 5, 2025Replacing 50 gallon gas water heater · 14 m away
- 6623 Crestland AveOct 2, 2025Add an additional 2 ton complete system and ductwork. r8 ducts. 8 supplies and 1 return. add 3 exhaust fans. add dryer vent duct · 29 m away
- 6619 Crestland AveJun 14, 2026A 2-ton gas air conditioning and heating system was installed · 39 m away
- 6605 Crestland AveNov 13, 2026Gas test release · 75 m away
- 6615 Shell Flower LnJan 2, 2025Master bedroom: extend closet master bathroom: relocate toilet, relocate shower, add a bath tub, and add 2 vanities add a shower and toilet in another kids room · 107 m away
- 6630 Shell Flower LnSep 17, 202526kw generator and 200ats installation · 110 m away
- 6723 Levelland RdAug 28, 2025No work clean and show · 128 m away
- 6719 Levelland RdSep 15, 2025Vacant electrical no work · 131 m away
- 6605 Hyacinth LnMay 21, 2025Foundation repair-install 21 pilings · 137 m away
- 6825 Levelland RdApr 6, 2026Electrical no work service release · 167 m away
- 6701 Crestland AveJun 24, 2026Removing old and installing a new 7’ tall cedar fence, 241 lf, 2 pedestrian gates, metal posts · 180 m away
- 17710 Davenport RdOct 20, 2025Demolition and haul off of the 1200 square foot structure/ house (resting on blocks) on property that has been cited by the city as needing to come down. we have all required and appropriate precautions and barriers in place. we are going to be using a excavator and 30 yard roll off dumpsters to remove all material · 194 m away