6802 Rocky Top Cir
Dallas, TX 75252
6802 Rocky Top Cir: 1 project on record
City of Dallas lists 1 filing across 1 project at 6802 Rocky Top Cir, Dallas, TX 75252. The most recent, filed September 8, 2025, covers: “200 amp panel and meter base replacement”.
Compiled from City of Dallas records · updated Sep 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 8, 2025
- since Sep 8, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6802 Rocky Top Cir
What is being built at 6802 Rocky Top Cir?
The latest filing (City of Dallas permit RES-ELC-25-002873, September 8, 2025) covers 200 amp panel and meter base replacement.
How many permits and filings does 6802 Rocky Top Cir have?
1 filing across 1 project, from September 8, 2025 to September 8, 2025.
Is there other construction near 6802 Rocky Top Cir?
Yes. Nearby filings include 6806 Rocky Top Cir (16ft sewer tunnel for repair with access, Sep 4, 2025); 6921 Rocky Top Cir (condenser and coil only change out like for like, May 23, 2025); 6918 Rocky Top Cir (install 1" double check valve with wye strainer, Jun 24, 2025).
How do I get alerts for new permits at 6802 Rocky Top Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75252- 6806 Rocky Top CirSep 4, 202516ft sewer tunnel for repair with access · 7 m away
- 6921 Rocky Top CirMay 23, 2025Condenser and coil only change out like for like · 104 m away
- 6918 Rocky Top CirJun 24, 2025Install 1" double check valve with wye strainer · 125 m away
- 6906 Rocky Top CirAug 3, 2026Gas line replacement · 141 m away
- 6950 Mccallum BlvdJun 29, 2026Dsst-pvt montessori academy construction of a 6' high metal entry vestibule/enclosure.location: front building entrance.dimensions: 9' (left return) x 10' (front) x 9' (right return).material: black metalmounting: posts are surface-mounted to the concrete deck with base plates · 159 m away
- 7301 Highland Glen TrlNov 24, 2025Install 11 exterior piers · 166 m away
- 7305 Highland Heather LnFeb 4, 2026Install 8 total pilings · 167 m away
- 7302 Highland Glen TrlAug 25, 2026Installation of 19 piers · 168 m away
- 7215 Highland Heather LnOct 17, 202526 piers · 170 m away
- 7305 Highland Glen TrlOct 13, 2026Install 17 total pilings (9 exterior, 2 exterior with concrete breakouts, 6 via tunneling) · 171 m away
- 7205 Highland Heather LnJul 1, 2026Full system install · 176 m away
- 7309 Highland Glen TrlDec 9, 2025Replace 2x 3 ton complete · 176 m away