17949 Brent Dr
Dallas, TX 75287
Foundation repair permitted at 17949 Brent Dr
A residential foundation repair at 17949 Brent Dr calls for installing eight concrete pilings to stabilize the foundation. The City of Dallas permit was filed June 19, 2026, under permit RES-FDN-26-000502.
Summarized from City of Dallas records · updated Jun 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 19, 2026
- since Jun 19, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 17949 Brent Dr
What is being built at 17949 Brent Dr?
The permit is for residential foundation repair, not a new building. It calls for eight concrete pilings to stabilize the foundation.
What work was permitted at 17949 Brent Dr in Dallas?
The City of Dallas permitted installation of eight concrete pilings for foundation stabilization on June 19, 2026.
When was the foundation repair permit filed?
The permit was filed June 19, 2026. Its number is RES-FDN-26-000502.
How many pilings will be installed at 17949 Brent Dr?
The permit description specifies eight concrete pilings.
Is 17949 Brent Dr a new construction project?
The record describes residential foundation repair to stabilize the foundation, rather than new construction.
Also being built nearby
All of 75287- 17963 Brent DrDec 1, 2025Replace gas furnace, evaporator coil, and condenser · 24 m away
- 3123 Alicia CirOct 14, 2026Installing 19 total piers · 29 m away
- 17966 Brent DrAug 3, 2026Remove and replace asphalt shingles on roof · 38 m away
- 17942 Mary Margaret StAug 22, 2025Replacing existing hvac unit with a new system · 86 m away
- 17919 Brent DrJun 11, 2026Install carrier single stage 3.5 ton natural gas system · 91 m away
- 17943 Mary Margaret StJul 14, 2025Replace faulty natural gas water heater · 96 m away
- 2929 Frankford RdAug 14, 2026Relocate existing circuits for fountain drinks equipment · 111 m away
- 17926 Mary Margaret StJun 30, 2026Install 14 pilings · 113 m away
- 2945 Frankford RdMay 20, 2026Mcr we will be raising the parapet walls on three sides of the buidling to establish a uniform look. there are existing parapets that will remain and attach to the new frame. the parapet will have stucco added to the front · 114 m away
- 17903 Mary Margaret StOct 13, 2026Replace 30 ft of gas pipe in back of the house · 166 m away
- 17817 Brent DrAug 27, 2026Gas test · 194 m away
- 3144 Renaissance DrJan 27, 2026Replacing 50 gallon electric water heater in garage · 195 m away