17963 Brent Dr
Dallas, TX 75287
Attic finish-out adds living area at 17963 Brent Dr
Permits indicate an attic finish-out to add living area at this residence, filed September 17, 2025. Later permits cover electrical work and replacement of the gas furnace, evaporator coil and condenser.
Summarized from City of Dallas records · updated Dec 1, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Dec 1, 2025
- since Sep 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 17963 Brent Dr
What is being built at 17963 Brent Dr?
A residential alteration permit indicates the attic is being finished out to add living area. The permit, RES-ALT-ADD-25-000735, was filed September 17, 2025.
Is 17963 Brent Dr a new home?
The records show an attic finish-out at a residence, not a permit for a new home. The alteration permit was filed September 17, 2025.
What work is planned for the attic at 17963 Brent Dr?
The permit description says the attic space will be finished out to add living area. An electrical permit for finishing out the attic followed on October 24, 2025.
What do the permits at 17963 Brent Dr cover?
The records include an attic finish-out, electrical work for the attic, and replacement of a gas furnace, evaporator coil and condenser. The related permits were filed between September 17 and December 1, 2025.
When was the latest permit filed for 17963 Brent Dr?
The latest listed permit was filed December 1, 2025. Permit RES-MEC-25-003813 covers replacement of the gas furnace, evaporator coil and condenser.
Also being built nearby
All of 75287- 17966 Brent DrAug 3, 2026Remove and replace asphalt shingles on roof · 18 m away
- 17949 Brent DrJun 19, 202617949 brent install 8 concrete pilings to stabilize foundation · 24 m away
- 3123 Alicia CirOct 14, 2026Installing 19 total piers · 46 m away
- 2929 Frankford RdAug 14, 2026Relocate existing circuits for fountain drinks equipment · 87 m away
- 2945 Frankford RdMay 20, 2026Mcr we will be raising the parapet walls on three sides of the buidling to establish a uniform look. there are existing parapets that will remain and attach to the new frame. the parapet will have stucco added to the front · 91 m away
- 17942 Mary Margaret StAug 22, 2025Replacing existing hvac unit with a new system · 103 m away
- 17943 Mary Margaret StJul 14, 2025Replace faulty natural gas water heater · 111 m away
- 17919 Brent DrJun 11, 2026Install carrier single stage 3.5 ton natural gas system · 115 m away
- 17926 Mary Margaret StJun 30, 2026Install 14 pilings · 132 m away
- 17903 Mary Margaret StOct 13, 2026Replace 30 ft of gas pipe in back of the house · 187 m away
- 3327 Renaissance DrJul 16, 2025Gas test · 204 m away
- 3144 Renaissance DrJan 27, 2026Replacing 50 gallon electric water heater in garage · 210 m away