18919 Voss Rd
Dallas, TX 75287
Hot water line reroute and gas water heater replacement
A City of Dallas residential plumbing permit covers rerouting a hot water line and replacing a 50-gallon gas water heater in the garage at 18919 Voss Rd. The permit was filed on August 24, 2026.
Summarized from City of Dallas records · updated Aug 24, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 24, 2026
- since Aug 24, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 18919 Voss Rd
What work is permitted at 18919 Voss Rd?
The permit covers a hot water line reroute and replacement of a 50-gallon gas water heater in the garage. It is a residential plumbing permit filed August 24, 2026.
Is a new home being built at 18919 Voss Rd?
The City of Dallas record describes plumbing work at the residence, not new-home construction.
What kind of water heater is being installed at 18919 Voss Rd?
The permit describes replacement of a 50-gallon gas water heater in the garage.
When was the permit for 18919 Voss Rd filed?
The City of Dallas filed the residential plumbing permit on August 24, 2026.
What is the permit number for work at 18919 Voss Rd?
The permit number is RES-PLM-26-008884.
How much will the work at 18919 Voss Rd cost?
The permit record does not report a valuation or project cost.
Also being built nearby
All of 75287- 18931 Voss RdMay 11, 2026Replace 4-ton complete system with gas furnace, condenser and coil · 15 m away
- 18920 Voss RdNov 12, 2026Install new 3/4 double check for sprinkler system in front yard · 21 m away
- 18928 Misthaven PlAug 5, 2025Complete rebuild of customer main water line emergency shutoff valve box · 63 m away
- 18936 Misthaven PlJul 13, 2026Hvac replacement · 79 m away
- 18944 Misthaven PlOct 19, 2026Nsfaa hall bathroom remodel: homeowner wishes to move the toilet 6" to the left so she can expand the shower pan 6". pkb (contractor) plans to trench & t into the existing sanitary drain and also do the same to the existing shower drain so that it is centered to the alcove. we are moving the toilet over 6" and moving the shower drain over 6" on the surface level. homeowner wishes to close off a hall closet but cut into the sheetrock in the bathroom to access the closet space - creating a closet in the bathroom · 92 m away
- 4307 Windhaven LnNov 4, 2026Replacement of freshwater yard service from city meter to home · 92 m away
- 18956 Misthaven PlJul 3, 20263 ton split gas system no ductwork · 95 m away
- 4319 Bendwood LnOct 8, 2026Replace waterline · 114 m away
- 4216 Windhaven LnNov 3, 2025New yard service up to 60 ft yard in the front · 131 m away
- 4316 Windhaven LnSep 2, 2026Installation of 19 pilings · 133 m away
- 4212 Bendwood LnAug 4, 20254 ton split gas system in attic no ductwork · 137 m away
- 4208 Bendwood LnSep 8, 2025Repair main service water line neart meter (yard leak) · 140 m away