18928 Misthaven Pl
Dallas, TX 75287
18928 Misthaven Pl: 1 project on record
City of Dallas lists 1 filing across 1 project at 18928 Misthaven Pl, Dallas, TX 75287. The most recent, filed August 5, 2025, covers: “Complete rebuild of customer main water line emergency shutoff valve box”.
Compiled from City of Dallas records · updated Aug 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 5, 2025
- since Aug 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 18928 Misthaven Pl
What is being built at 18928 Misthaven Pl?
The latest filing (City of Dallas permit RES-PLM-25-003240, August 5, 2025) covers complete rebuild of customer main water line emergency shutoff valve box.
How many permits and filings does 18928 Misthaven Pl have?
1 filing across 1 project, from August 5, 2025 to August 5, 2025.
Is there other construction near 18928 Misthaven Pl?
Yes. Nearby filings include 18936 Misthaven Pl (hvac replacement, Jul 13, 2026); 18944 Misthaven Pl (nsfaa hall bathroom remodel: homeowner wishes to move the toilet 6" to the left so she can expand the shower pan 6". pkb (contractor) plans to trench & t into the existing sanitary drain and also do the same to the existing shower drain so that it is centered to the alcove. we are moving the toilet over 6" and moving the shower drain over 6" on the surface level. homeowner wishes to close off a hall closet but cut into the sheetrock in the bathroom to access the closet space - creating a closet in the bathroom, Oct 19, 2026); 18956 Misthaven Pl (3 ton split gas system no ductwork, Jul 3, 2026).
How do I get alerts for new permits at 18928 Misthaven Pl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75287- 18936 Misthaven PlJul 13, 2026Hvac replacement · 16 m away
- 18944 Misthaven PlOct 19, 2026Nsfaa hall bathroom remodel: homeowner wishes to move the toilet 6" to the left so she can expand the shower pan 6". pkb (contractor) plans to trench & t into the existing sanitary drain and also do the same to the existing shower drain so that it is centered to the alcove. we are moving the toilet over 6" and moving the shower drain over 6" on the surface level. homeowner wishes to close off a hall closet but cut into the sheetrock in the bathroom to access the closet space - creating a closet in the bathroom · 34 m away
- 18956 Misthaven PlJul 3, 20263 ton split gas system no ductwork · 48 m away
- 18920 Voss RdNov 12, 2026Install new 3/4 double check for sprinkler system in front yard · 57 m away
- 18919 Voss RdAug 24, 2026Hot water line reroute, 50 gal gas water heater replaced in garage and gas lock out · 63 m away
- 18931 Voss RdMay 11, 2026Replace 4-ton complete system with gas furnace, condenser and coil · 68 m away
- 4307 Windhaven LnNov 4, 2026Replacement of freshwater yard service from city meter to home · 72 m away
- 4316 Windhaven LnSep 2, 2026Installation of 19 pilings · 85 m away
- 4319 Bendwood LnOct 8, 2026Replace waterline · 131 m away
- 4216 Windhaven LnNov 3, 2025New yard service up to 60 ft yard in the front · 169 m away
- 4403 Rushing RdJul 28, 2025Nsfaa-add outdoor kitchen with pergola - utilities of gas and eletric · 179 m away
- 4324 N Capistrano DrMar 10, 2026To replace x1 50 gal gas water heater in the garage · 187 m away