2616 Appledale Ln
Dallas, TX 75287
2616 Appledale Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 2616 Appledale Ln, Dallas, TX 75287. The most recent, filed August 12, 2025, covers: “Be tearing off existing roof down to bear decking. installing new synthetic underlayment and ice and water barrier in all vulnerable areas. new 30 year architectural shingle with all new accessories”.
Compiled from City of Dallas records · updated Aug 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 12, 2025
- since Aug 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectBe tearing off existing roof down to bear decking. installing new synthetic underlayment and ice and water barrier in all vulnerable areas. new 30 year architectural shingle with all new accessories
Be tearing off existing roof down to bear decking. installing new synthetic underlayment and ice and water barrier in all vulnerable areas. new 30 year architectural shingle with all new accessories
City of Dallas permitResidential Roofing Permit
Sources: City of Dallas
Questions about 2616 Appledale Ln
What is being built at 2616 Appledale Ln?
The latest filing (City of Dallas permit RES-ROOF-25-000671, August 12, 2025) covers be tearing off existing roof down to bear decking. installing new synthetic underlayment and ice and water barrier in all vulnerable areas. new 30 year architectural shingle with all new accessories.
How many permits and filings does 2616 Appledale Ln have?
1 filing across 1 project, from August 12, 2025 to August 12, 2025.
Is there other construction near 2616 Appledale Ln?
Yes. Nearby filings include 2620 Appledale Ln (7' tall cedar fence steel posts, Aug 14, 2026); 2635 Appledale Ln (sewer repipe: dig exterior access at two way main line double cleanout tunnel under foundation approximately 22 feet to expose where main line exits , hall bathroom fixtures , and master toilet. replace all exposed sewer under foundation within 22 feet of exposed tunnel back to main line cleanouts - excavate a safe access pit and tunnel under the concrete slab and expose the effected area of piping. cut out the effected area of piping and replace with schedule 40 pvc. from inside of the tunnel drill into the concrete slab and install anchors, all thread, and galvanized clevis hangers every 3-4 feet on exposed pipe. backfill and compact tunnel, clean up worksite and haul away debris, Jul 29, 2026); 2519 Silverthorne Dr (wire swimming pool, Jan 18, 2026).
How do I get alerts for new permits at 2616 Appledale Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75287- 2620 Appledale LnAug 14, 20267' tall cedar fence steel posts · 7 m away
- 2635 Appledale LnJul 29, 2026Sewer repipe: dig exterior access at two way main line double cleanout tunnel under foundation approximately 22 feet to expose where main line exits , hall bathroom fixtures , and master toilet. replace all exposed sewer under foundation within 22 feet of exposed tunnel back to main line cleanouts - excavate a safe access pit and tunnel under the concrete slab and expose the effected area of piping. cut out the effected area of piping and replace with schedule 40 pvc. from inside of the tunnel drill into the concrete slab and install anchors, all thread, and galvanized clevis hangers every 3-4 feet on exposed pipe. backfill and compact tunnel, clean up worksite and haul away debris · 36 m away
- 2519 Silverthorne DrJan 18, 2026Wire swimming pool · 44 m away
- 2503 Silverthorne DrAug 22, 2026Install 3/4" water pipe up to 10 ft by installing components, securing fittings, and testing for leaks and proper operation · 53 m away
- 2615 Kingsridge DrJul 29, 2026Nsfaa-install a 300 sq ft patio cover · 96 m away
- 2611 Kingsridge DrSep 2, 2026Reroof due to weather related damages · 100 m away
- 2612 Kingsridge DrJun 25, 2026Replace existing 50 gallon gas water heater located in the garage · 108 m away
- 2620 Silverthorne DrSep 2, 2026Installing irrigation system and double check valve · 109 m away
- 2440 Ridgestone DrAug 3, 2026Tub to tub replacement with new valve · 147 m away
- 2424 Ridgestone DrAug 17, 2026Replacing the air handler unit · 171 m away
- 2423 Silverthorne DrMar 18, 2026Reroute water line overhead to bypass line leaking below slab · 183 m away
- 2403 Ridgestone DrJul 13, 2026Replace 3 ton complete · 200 m away