groundranger
Recent · latest filing Aug 2025Residential

2616 Appledale Ln

Dallas, TX 75287

2616 Appledale Ln: 1 project on record

City of Dallas lists 1 filing across 1 project at 2616 Appledale Ln, Dallas, TX 75287. The most recent, filed August 12, 2025, covers: “Be tearing off existing roof down to bear decking. installing new synthetic underlayment and ice and water barrier in all vulnerable areas. new 30 year architectural shingle with all new accessories”.

Compiled from City of Dallas records · updated Aug 12, 2025

Projects
1
1 filings
Latest filing
Aug 12, 2025
since Aug 12, 2025
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Be tearing off existing roof down to bear decking. installing new synthetic underlayment and ice and water barrier in all vulnerable areas. new 30 year architectural shingle with all new accessories

    Be tearing off existing roof down to bear decking. installing new synthetic underlayment and ice and water barrier in all vulnerable areas. new 30 year architectural shingle with all new accessories

    City of Dallas permitResidential Roofing Permit
    Record
    RES-ROOF-25-000671
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2616 Appledale Ln

What is being built at 2616 Appledale Ln?

The latest filing (City of Dallas permit RES-ROOF-25-000671, August 12, 2025) covers be tearing off existing roof down to bear decking. installing new synthetic underlayment and ice and water barrier in all vulnerable areas. new 30 year architectural shingle with all new accessories.

How many permits and filings does 2616 Appledale Ln have?

1 filing across 1 project, from August 12, 2025 to August 12, 2025.

Is there other construction near 2616 Appledale Ln?

Yes. Nearby filings include 2620 Appledale Ln (7' tall cedar fence steel posts, Aug 14, 2026); 2635 Appledale Ln (sewer repipe: dig exterior access at two way main line double cleanout tunnel under foundation approximately 22 feet to expose where main line exits , hall bathroom fixtures , and master toilet. replace all exposed sewer under foundation within 22 feet of exposed tunnel back to main line cleanouts - excavate a safe access pit and tunnel under the concrete slab and expose the effected area of piping. cut out the effected area of piping and replace with schedule 40 pvc. from inside of the tunnel drill into the concrete slab and install anchors, all thread, and galvanized clevis hangers every 3-4 feet on exposed pipe. backfill and compact tunnel, clean up worksite and haul away debris, Jul 29, 2026); 2519 Silverthorne Dr (wire swimming pool, Jan 18, 2026).

How do I get alerts for new permits at 2616 Appledale Ln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75287
Get alerts for 2616 Appledale Ln