Foundation, sewer and water-heater work at 2635 Appledale Ln
City of Dallas permits indicate residential foundation, sewer and water-heater work at 2635 Appledale Ln. The foundation repair permit was filed June 26, 2026; plumbing permits followed on July 15 and July 29, 2026.
Summarized from City of Dallas records · updated Jul 29, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jul 29, 2026
- since Jun 26, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSewer repipe: dig exterior access at two way main line double cleanout tunnel under foundation approximately 22 feet to expose where main line exits , hall bathroom fixtures , and master toilet. replace all exposed sewer under foundation within 22 feet of exposed tunnel back to main line cleanouts - excavate a safe access pit and tunnel under the concrete slab and expose the effected area of piping. cut out the effected area of piping and replace with schedule 40 pvc. from inside of the tunnel drill into the concrete slab and install anchors, all thread, and galvanized clevis hangers every 3-4 feet on exposed pipe. backfill and compact tunnel, clean up worksite and haul away debris
Sewer repipe: dig exterior access at two way main line double cleanout tunnel under foundation approximately 22 feet to expose where main line exits , hall bathroom fixtures , and master toilet. replace all exposed sewer under foundation within 22 feet of exposed tunnel back to main line cleanouts - excavate a safe access pit and tunnel under the concrete slab and expose the effected area of piping. cut out the effected area of piping and replace with schedule 40 pvc. from inside of the tunnel drill into the concrete slab and install anchors, all thread, and galvanized clevis hangers every 3-4 feet on exposed pipe. backfill and compact tunnel, clean up worksite and haul away debris
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 2635 Appledale Ln
What is being built at 2635 Appledale Ln?
The City of Dallas records show home repairs, not a new building: foundation piling installation, sewer repiping and a 50-gallon electric water heater.
What foundation work is planned at 2635 Appledale Ln?
Permit RES-FDN-26-000520, filed June 26, 2026, lists installation of 27 pilings.
Is the sewer being replaced at 2635 Appledale Ln?
A City of Dallas plumbing permit describes replacing an affected section of sewer piping beneath the foundation with Schedule 40 PVC. Permit RES-PLM-26-007837 was filed July 29, 2026.
Is a new water heater being installed at 2635 Appledale Ln?
A plumbing permit filed July 15, 2026, lists a 50-gallon electric water heater located in the garage. The permit number is RES-PLM-26-007312.
When were permits filed for work at 2635 Appledale Ln?
The three City of Dallas permits were filed June 26, July 15 and July 29, 2026. They cover foundation repair and plumbing work.
Also being built nearby
All of 75287- 2620 Appledale LnAug 14, 20267' tall cedar fence steel posts · 29 m away
- 2616 Appledale LnAug 12, 2025Be tearing off existing roof down to bear decking. installing new synthetic underlayment and ice and water barrier in all vulnerable areas. new 30 year architectural shingle with all new accessories · 36 m away
- 2519 Silverthorne DrJan 18, 2026Wire swimming pool · 75 m away
- 2503 Silverthorne DrAug 22, 2026Install 3/4" water pipe up to 10 ft by installing components, securing fittings, and testing for leaks and proper operation · 89 m away
- 2615 Kingsridge DrJul 29, 2026Nsfaa-install a 300 sq ft patio cover · 109 m away
- 2620 Silverthorne DrSep 2, 2026Installing irrigation system and double check valve · 112 m away
- 2611 Kingsridge DrSep 2, 2026Reroof due to weather related damages · 115 m away
- 2612 Kingsridge DrJun 25, 2026Replace existing 50 gallon gas water heater located in the garage · 119 m away
- 2440 Ridgestone DrAug 3, 2026Tub to tub replacement with new valve · 183 m away
- 2424 Ridgestone DrAug 17, 2026Replacing the air handler unit · 207 m away
- 2732 Daybreak DrDec 8, 2025Reroute water line below slab accessed via 5' tunnel · 209 m away
- 2423 Silverthorne DrMar 18, 2026Reroute water line overhead to bypass line leaking below slab · 218 m away