Pool and restroom demolition, plus apartment HVAC replacements
City of Dallas permits indicate pool and restroom-structure demolition and HVAC replacements in apartment units at 4141 Horizon North Pkwy. The HVAC permits were filed August 10, 2026, and the demolition permits were filed September 1 and September 24, 2026.
Summarized from City of Dallas records · updated Sep 24, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Sep 24, 2026
- since Aug 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsDemolition back pool, and as more particularlydescribed and defined in the contract documents
Demolition back pool, and as more particularlydescribed and defined in the contract documents
City of Dallas permitCommercial Demolition Permit
Sources: City of Dallas
Questions about 4141 Horizon North Pkwy
What is being built at 4141 Horizon North Pkwy?
The available permits describe demolition of a pool and restroom structure, along with HVAC equipment replacements in apartment units. They do not list new construction.
Is the pool at 4141 Horizon North Pkwy being removed?
Two City of Dallas demolition permits refer to pool demolition or removal. They were filed September 1, 2026 (COM-DEM-26-000140) and September 24, 2026 (COM-DEM-26-000146).
What is being demolished at 4141 Horizon North Pkwy?
The permit descriptions refer to a pool, pool equipment, and a restroom structure. The records do not provide further details about the demolition.
Are apartments at 4141 Horizon North Pkwy getting new air-conditioning equipment?
Three permits filed August 10, 2026, describe replacing existing equipment with 1.5-ton split systems in apartments 115, 526, and 1833.
When were permits filed for work at 4141 Horizon North Pkwy?
The listed permits were filed from August 10 through September 24, 2026. The August filings cover apartment HVAC replacements, and the September filings cover demolition.
Is a new building planned at 4141 Horizon North Pkwy?
The permits in these records describe pool and restroom-structure demolition and apartment HVAC replacements; they do not list a new building.
Also being built nearby
All of 75287- 4200 Horizon North PkwyFeb 18, 2026Wire and install a disconnect to building 11, apartment 1114 · 57 m away
- 4300 Horizon North PkwyMay 13, 2026Building. 16 unit 24, replace main disconnect · 142 m away
- 4002 Horizon North PkwyApr 9, 2026Electrical service for traffic signal at intersection of midway and horizon north pkwy. se corner · 213 m away
- 4141 Rosemeade PkwyJun 4, 20252 rpz · 401 m away
- 6504 International Parkway · Fisher Asset Management LLC Dba Fisher InvestmentsJan 23, 2024Fisher investments suite 1200 tenant improvement — renovation/alteration — interior tenant improvements to an existing building · 429 m away
- 4139 Midrose TrlMay 6, 2026Replace 4 ton gas ac · 454 m away
- 19004 Midway RdMar 4, 2026Install rpz (in the kitchen) · 463 m away
- 4158 Midrose TrlJul 4, 2025Installing condenser, furnace and coil · 471 m away
- 4191 Midrose TrlMay 14, 2025Install 6 roof mounted solar panels. 2.46 kw, 2 enphase batteries. 1 ev charger · 486 m away
- 4119 Midrose TrlJun 3, 2025Replacing a 3 ton gas complete system · 490 m away
- 4192 Rosemeade PkwyFeb 27, 2026Installation of electric all in one meter pedestal with built in breaker panel for monument lighting. we will also be installing monument lighting and power for holiday lighting · 513 m away
- 4108 Midrose TrlNov 17, 2025X1 50 gal gas water heater in attic above the garage · 521 m away