11 addresses in 75287 have permits or project filings for demolitions in the last two years. The most recent was filed at 3832 Belton Dr.
Latest filings
- 3832 Belton DrOct 30, 2026Patiño rough in
- 4581 Frankford Rd · Digsc Investments, LLCOct 21, 2026Plumbing work
- 5515 Inverrary CtOct 13, 2026House dammaged by fire. need to demolish completely house, foundation, pool, driveway. clear lot. no trees
- 3678 Timberglen Rd · Carrollton-Farmers Branch ISDOct 4, 2026Dsst-cfbisd mcwhorter elementary school fence replacement
- 4141 Horizon North PkwySep 24, 2026Demolition back pool, and as more particularlydescribed and defined in the contract documents
- 5323 Harbor Town DrJun 25, 2026Install plumbing for new home
- 4008 Lawngate DrMay 13, 2026Nsfaa build 240 sq ft addition to house to include new bathroom, bedroom, and closet. build new covered patio over existing patio.work will include brick demolition, concrete slab, plumbing, electrical, mechanical, tile, paint, flooring, and doors
- 18111 Kelly BlvdMay 8, 2026Installation of fences for cfbisd fence package 1. sheffield, mckamy, mcwhorter elementary schools
- 5055 Pear Ridge DrJul 22, 2025Demolition and install 2.5-ton straight cool electric complete system; supply plenum, boots, grilles and associated r8 flex duct, return grilles
- 4100 Spring Valley RdJul 15, 2025New chiller: ch-2 dunham bush mn: wcfx30srvework to be done by msntx scope below:demolition one (1) existing chiller.install one (1) new chiller on existing housekeeping padhms will provide all rigging pertaining to the chiller changeout. recover freon in existing chiller prior to chiller being demoed and be the responsibility of hms to remove from site.remove one existing fan on the north wall in the mechanical room and make an opening to remove the existing chiller and to bring in the new chiller and then put it back.remove the existing pipe stand to allow the chillers to be able to be moved into the mechanical room.receive one (1) chiller and provide 1 month’s storage at crane yard and shipping to job site on day of installation.hms will assist with facilities maintenance in isolating and draining down of existing chiller to be demoed.install one (1) new chiller.modify existing piping to fit new chiller.existing valves to remain.refrigerant relief line from new chiller #1 and tie into existing refrigerant relief line.chill water piping to be insulated with 1-1/2” fiberglass to match existing means and methods.hms will discard of all demoed equipment and be the responsibility of hms to remove from site.hms will remove all trash pertaining to the job and clean work area at end of the day prior to leaving the job site.work to be done during normal hours
- 2779 Old Mill RdJul 14, 2025Partial removal of an existing modified bitumen roof and decking and complete demolition and removal of existing hvac systems for the installation of a new
- 18451 Dallas Parkway · Winhall 8 LLCDec 10, 2024Aic dallas renovation — renovation/alteration — interior walls, ceilings, and finishes. demolition and new. minor exterior work including exit doors and sidewalk
Questions
What demolitions are being built in Dallas 75287?
11 addresses in 75287 have permits or project filings for demolitions in the last two years. The most recent was filed at 3832 Belton Dr. Others include 4581 Frankford Rd, 5515 Inverrary Ct, 3678 Timberglen Rd.
How can I find out when a new demolition is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new demolition permit is filed.