groundranger
Recent · latest filing May 2026Commercial

2280 Inwood Rd, Dallas, TX 75390

Dallas, TX 75390 · Ut Southwestern Medical Center Radiation Oncology

UT Southwestern CT room renovation at 2280 Inwood Road

A 777-square-foot renovation will replace equipment in an existing second-floor CT room at 2280 Inwood Road. The project was registered with TDLR on May 7, 2026; the registration says the equipment will be replaced in the same location and existing finishes touched up as needed.

Summarized from Texas Department of Licensing and Regulation records · updated May 7, 2026

Projects
1
1 filings
Latest filing
May 7, 2026
since May 7, 2026
Largest scope
777 sf
Estimated cost
$214K
state registration

Where this project stands

In state plan review

UTSW RADIOLOGY ONCOLOGY EF2 410A CT REPLACEMENT

777 sq ft · $214K est.

  1. RegisteredMay 7, 2026
  2. Plan reviewnow
  3. ConstructionApr '26 – Jun '26
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Renovation of existing 2nd floor ct room. equipment will be replaced in same location like for like. existing finishes will be touched up as necessary. — ut southwestern medical center radiation oncology

    TDLR project registrationRenovation/AlterationProject Registered777 sq ft$214K est.
    Tenant / owner
    Utsw Radiology Oncology Ef2 410a Ct Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2280 Inwood Rd, Dallas, TX 75390

What is being built at 2280 Inwood Road in Dallas?

The project is a renovation of an existing second-floor CT room at UT Southwestern Radiation Oncology. The equipment will be replaced in the same location.

When was the CT room renovation registered?

The project was registered with TDLR on May 7, 2026. Its registration number is TABS2026019635.

Is this a new building or a renovation?

It is a renovation of an existing CT room, not a new building. The registration describes a 777-square-foot project.

What work is planned for the second-floor CT room?

The CT equipment will be replaced in its existing location, and finishes will be touched up as needed, according to the TDLR registration.

How much is the CT room project estimated to cost?

The TDLR registration lists an estimated project cost of $214,000.

What is happening next to the radiation oncology CT replacement at 2280 Inwood Road?

A separate project at the same address covers replacement of equipment in an existing first-floor CT room. The second-floor CT room renovation was registered on May 7, 2026.

Also being built nearby

All of 75390
Email me when plan review is complete