EPCC Valle Verde adds a restroom portable and site work

Work at El Paso Community College’s Valle Verde campus includes utility connections for a relocated classroom portable and a new restroom portable, plus sidewalks and other site improvements. The project was registered with TDLR on May 6, 2025, under project number TABS2025018320.

Summarized from Texas Department of Licensing and Regulation records · updated May 6, 2025

Projects
1
1 filings
Latest filing
May 6, 2025
since May 6, 2025
Largest scope
1,560 sf
Estimated cost
$600K
state registration

Where this project stands

Inspected · closing out

Existing Relocated Classroom and New Restroom Portables

1,560 sq ft · $600K est.

  1. RegisteredMay 6, 2025
  2. Plan review
  3. ConstructionJun '25 – Jul '25
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. New utility connections to relocated existing classroom portable & new restroom portable. new concrete sidewalks, alternate 1 & 2. new small 3 car parking lot, alt 1. new pavement system to exist road, alt 1. new concrete ramp & stair, alt 2. — el paso community college - valle verde campus

    TDLR project registrationRenovation/AlterationInspection Complete1,560 sq ft$600K est.
    Tenant / owner
    Existing Relocated Classroom And New Restroom Portables
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 919 Hunter Drive

What is being built at 919 Hunter Drive?

The project includes utility connections for a relocated classroom portable and a new restroom portable at El Paso Community College’s Valle Verde campus. The registration also lists sidewalks and other site work.

What’s being built at El Paso Community College’s Valle Verde campus?

A TDLR project registration describes connections for a relocated classroom portable and a new restroom portable, along with sidewalks, pavement work, and other improvements. It was filed May 6, 2025.

Is a new classroom being built at 919 Hunter Drive?

The project description says an existing classroom portable is being relocated; it does not describe a new classroom. It also lists a new restroom portable.

Is there a new parking lot planned at the Valle Verde campus?

The registration lists a small, three-car parking lot as an alternate item. It also lists pavement work to an existing road.

How much will the project at 919 Hunter Drive cost?

The TDLR registration lists an estimated project cost of $600,000. This is the applicant’s estimate, not a confirmed final cost.

When was the Valle Verde campus project registered?

The project was registered with TDLR on May 6, 2025. Its project number is TABS2025018320.