groundranger
Recent · latest filing Jul 2026Commercial

1301 Pennsylvania Ave

Fort Worth, TX 76104 · Justin Tower Vertical Expansion, Thfw Ed New Ct3 Renovation + 7 more

Five-story Justin Tower expansion planned in Fort Worth

A five-story vertical expansion of Justin Tower is planned at 1301 Pennsylvania Ave in Fort Worth. A Texas Department of Licensing and Regulation project registration filed July 21, 2026, describes 170,000 square feet of new space, with 34,000 square feet on each floor. The applicant estimates the project cost at $250 million.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 21, 2026

Projects
10
10 filings
Latest filing
Jul 21, 2026
since Mar 18, 2024
Largest scope
170,000 sf
Estimated cost
$250M
state registration

Where this project stands

Under construction

Justin Tower Vertical Expansion

170,000 sq ft · $250M est.

  1. RegisteredJul 21, 2026
  2. Plan review
  3. ConstructionAug '26 – Sep '28
  4. Inspected
  5. Closed
14% through of a 25-month buildAug 7, 2026 → Sep 8, 2028

4 contacts on this project · 3 phone numbers

Permit & project history

10 projects
  1. This is a vertical expansion of the base tower 11 floors. it will be a 5-story expansion with 34,000sf on each floor. — texas health harris methodist hospital fort worth

    TDLR project registrationRenovation/AlterationReview Complete170,000 sq ft$250M est.
    Tenant / owner
    Justin Tower Vertical Expansion
    Design firm
    Pro
    Contact
    Pro
  2. Renovation of existing emergency department to provide 1 new ct and tech work room. — texas health harris methodist hospital fort worth

    TDLR project registrationRenovation/AlterationProject Closed850 sq ft$880K est.
    Tenant / owner
    Thfw Ed New Ct3 Renovation
    Design firm
    Pro
    Contact
    Pro
  3. Project scope consists of the removal and replacement of an existing wheel chair ramp connecting a parking garage to an elevator lobby. — texas health harris methodist hospital

    TDLR project registrationRenovation/AlterationProject Closed600 sq ft$100K est.
    Tenant / owner
    Pro
    Design firm
    Pro
    Contact
    Pro
  4. Renovation of the existing shell space on levels 4 & 5 into new universal care floor with 36 beds on each floor. total new rooms is 72. new design matches previously built floors above. — texas health harris methodist hospital fort worth

    TDLR project registrationRenovation/AlterationInspection Complete58,770 sq ft$24M est.
    Tenant / owner
    Justin Tower Level 4 & 5 Finish Out
    Design firm
    Pro
    Contact
    Pro
  5. Renovation to existing satellite pharmacy space in bloxum tower. renovation of adjacent doctors' lounge. — texas health harris methodist hospital fort worth

    TDLR project registrationRenovation/AlterationReview Complete1,045 sq ft$1.6M est.
    Tenant / owner
    Hazardous Pharmacy Storage Renovations
    Design firm
    Pro
    Contact
    Pro
  6. Renovation of existing sterile processing department which includes equipment upgrades and space layout. includes shell space on level 03 becoming sterile storage with staff support space. — texas health harris methodist hospital fort worth

    TDLR project registrationRenovation/AlterationInspection Complete15,850 sq ft$3.1M est.
    Tenant / owner
    Sterile Processing Department Renovations
    Design firm
    Pro
    Contact
    Pro
  7. Emergency Renovation

    4,900sf renovation of emergency department waiting and triage areas. — texas health harris methodist hospital fort worth

    TDLR project registrationRenovation/AlterationInspection Complete4,900 sq ft$2.1M est.
    Tenant / owner
    Emergency Renovation
    Design firm
    Pro
    Contact
    Pro
  8. Convert two existing rooms into a milk bank for nicu 773sf — texas health harris methodist hospital

    TDLR project registrationRenovation/AlterationProject Closed773 sq ft$500K est.
    Tenant / owner
    Jones Tower Milk Bank Renovation
    Design firm
    Pro
    Contact
    Pro
  9. THFW Hybrid #2

    Renovation of an existing or and support room into a hybrid or and control room. — texas health harris methodist hospital fort worth

    TDLR project registrationRenovation/AlterationProject Closed1,230 sq ft$1.2M est.
    Tenant / owner
    Thfw Hybrid #2
    Design firm
    Pro
    Contact
    Pro
  10. THFW New Helipad

    Construction of new helipad adjacent to an existing helipad. — texas health harris methodist hospital fort worth

    TDLR project registrationNew ConstructionProject Closed12,700 sq ft$1.5M est.
    Tenant / owner
    Thfw New Helipad
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1301 Pennsylvania Ave

What is being built at 1301 Pennsylvania Ave in Fort Worth?

A five-story vertical expansion of Justin Tower is planned, with 170,000 square feet of space. The TDLR project registration describes 34,000 square feet on each floor.

When was the Justin Tower expansion registered?

The TDLR project registration was filed July 21, 2026. It is listed as Review Complete.

What is the project number for the Justin Tower expansion?

The TDLR registration number is TABS2026025802. It was filed July 21, 2026.

How much will the Justin Tower expansion cost?

The applicant's estimated cost is $250 million. This is a project estimate, not a final reported construction cost.

How large will the Justin Tower expansion be?

The registration lists 170,000 square feet across five floors, or 34,000 square feet per floor.

What is being built near Texas Health Vascular Surgical Specialists on Pennsylvania Avenue?

A five-story vertical expansion of Justin Tower is planned at 1301 Pennsylvania Ave, near Texas Health Vascular Surgical Specialists at 1325 Pennsylvania Avenue. The TDLR registration describes 170,000 square feet of new space.

Also being built nearby

All of 76104

More warehouses & industrial in 76104, medical facilities in 76104, parking structures in 76104.

Email me when it passes inspection