groundranger
Recent · latest filing May 2026Commercial

801 Seventh Ave

Fort Worth, TX 76104 · Dodson L0 Meg Replacement, Dodson L2 Endo Meds Room + 2 more

Cook Children's medical center renovations and MEG equipment replacement

TDLR registrations show several interior renovations at this multi-tenant medical center, including a 400-square-foot MEG equipment replacement registered May 21, 2026. The work includes new electrical receptacles and switches, ductwork renovations, and a slab depression for the equipment. Other registrations cover exam-room renovations, a medication room, and an AV upgrade.

Summarized from Texas Department of Licensing and Regulation records · updated May 21, 2026

Projects
4
4 filings
Latest filing
May 21, 2026
since May 13, 2025
Largest scope
4,800 sf
Estimated cost
$296K
state registration

Where this project stands

Finishing up · inspection next

Dodson L0 MEG Replacement

400 sq ft · $255K est.

  1. RegisteredMay 21, 2026
  2. Plan review
  3. ConstructionJul '26 – Sep '26
  4. Inspectednow
  5. Closed

Scheduled to finish Sep 18, 2026; the state inspection hasn't been filed yet.

4 contacts on this project · 3 phone numbers

Permit & project history

4 projects
  1. Installation of new meg equipment. installation of new electrical receptacles and switches. renovation of existing duct work. slab depression for new meg equipment. 400 sq ft — cook children's medical center

    TDLR project registrationRenovation/AlterationReview Complete400 sq ft$255K est.
    Tenant / owner
    Dodson L0 Meg Replacement
    Design firm
    Pro
    Contact
    Pro
  2. Dodson L2 Endo Meds Room

    Replace lighting fixtures and add light dimming switch. remove & add power receptacles throughout the work area. remove & add data outlets throughout work area. add a wall and millwork for additional work stations. 300 sq ft — cook children's medical center

    TDLR project registrationRenovation/AlterationProject Closed300 sq ft$124K est.
    Tenant / owner
    Dodson L2 Endo Meds Room
    Design firm
    Pro
    Contact
    Pro
  3. Dodson L2 Urology

    Renovation of existing offices to become exam rooms. installation of new sink, sliding door, and millwork to each new exam room. 230 sq ft — cook children's medical center

    TDLR project registrationRenovation/AlterationProject Closed230 sq ft$208K est.
    Tenant / owner
    Dodson L2 Urology
    Design firm
    Pro
    Contact
    Pro
  4. Replace lighting fixtures. remove & add power receptacles throughout the work area. remove old av equipment panels. update av equipment. — cook children's medical center

    TDLR project registrationRenovation/AlterationProject Closed4,800 sq ft$296K est.
    Tenant / owner
    Pavilion Classroom Av Upgrade
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 801 Seventh Ave

What is being built at 801 Seventh Ave in Fort Worth?

TDLR registrations describe interior renovations at the multi-tenant medical center, including replacement of MEG equipment and upgrades to exam rooms, a medication room, and classroom AV equipment. They do not describe a new standalone building.

Is there a new MEG machine project at 801 Seventh Ave?

Yes. A 400-square-foot MEG equipment replacement was registered on May 21, 2026, under TABS2026020928. The listed work includes electrical changes, ductwork renovations, and a slab depression for the equipment.

What renovations are planned at 801 Seventh Ave?

The registrations include converting existing offices into exam rooms, adding workstations in a medication room, replacing MEG equipment, and updating AV equipment in a classroom. The exam-room work was registered July 1, 2025, under TABS2025022458.

What's being renovated near Cook Children's Dodson Level 7?

At 801 Seventh Ave, registrations describe several interior projects at the multi-tenant medical center, including a MEG equipment replacement registered May 21, 2026. Cook Children's Dodson Level 7 is listed about 207 meters away.

What is the medication room project at 801 Seventh Ave?

The 300-square-foot Dodson L2 Endo Meds Room project adds a wall and millwork for workstations and updates lighting, power receptacles, and data outlets. It was registered December 1, 2025, under TABS2026006894.

Is a new building being constructed at 801 Seventh Ave?

The listed TDLR projects are renovations and alterations within the multi-tenant medical center, not a new standalone building. They include interior medical-space work and equipment and AV upgrades.

Also being built nearby

All of 76104

More offices in 76104, schools & daycares in 76104.

Email me when it passes inspection