1500 S. Main
Fort Worth, TX 76104 · Jps Health Network
JPS Health Main Campus entry vestibule renovation
A pedestrian entry vestibule and new storefront are planned at JPS Health Main Campus, replacing an existing revolving door and storefront. The TDLR project registration was filed January 16, 2025, and describes an 800-square-foot renovation. The applicant estimated the project cost at $240,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 16, 2025
- since Jan 16, 2025
- Largest scope
- 800 sf
- Estimated cost
- $240K
- state registration
Where this project stands
CompletedJPS HEALTH MAIN CAMPUS ENTRY VESTIBULE RENOVATION
800 sq ft · $240K est.
- RegisteredJan 16, 2025
- Plan review
- ConstructionApr '25 – Aug '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRemoval of an existing revolving door and storefront and replacing it with a pedestrian vestibule / new storefront and associated finishes — jps health main campus
TDLR project registrationRenovation/AlterationProject Closed800 sq ft$240K est.- Project #
- TABS2025009715
- Tenant / owner
- Jps Health Main Campus Entry Vestibule Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1500 S. Main
What is being built at 1500 S. Main in Fort Worth?
The project registration describes a new pedestrian vestibule and storefront at JPS Health Main Campus, replacing an existing revolving door and storefront. The 800-square-foot renovation is listed as project TABS2025009715.
What is changing at JPS Health Main Campus near John Peter Smith Hospital?
The registered work is an entry vestibule renovation, including removal of an existing revolving door and storefront and installation of a pedestrian vestibule and new storefront.
When was the JPS Health Main Campus vestibule project filed?
The TDLR project registration was filed January 16, 2025. Its project number is TABS2025009715.
How much will the JPS vestibule renovation cost?
The applicant's estimated cost for the project is $240,000. This is an estimate, not a reported final cost.
How large is the JPS Health Main Campus entry renovation?
The TDLR registration lists the renovation at 800 square feet.
Is a new hospital being built at 1500 S. Main?
The project registered January 16, 2025, is an entry vestibule and storefront renovation, not a hospital construction project. The registration lists its status as closed.
Also being built nearby
All of 76104- 1500 S Main St · Jps Health NetworkApr 3, 2026Jps trinity springs toilet room finish upgrade — renovation/alteration — refresh finishes in patient toilet rooms
- 1500 S. Main Street · John Peter Smith HospitalNov 20, 2025Jps hospital addition — new construction — 1,000,000 sq ft replacement hospital addition
- 1575 S. Main Street · John Peter Smith HospitalAug 5, 2025Jps hospital ambulance drive relocation — renovation/alteration — site work including ambulance vehicle and police parking and interior renovation work associated with ambulance drive relocation · 66 m away
- 1575 S Main Street 1575 S Main Street · Jps Health NetworkJun 26, 2024Jps pavillion or - ahu replacement — additions to existing building — addition of mechanical penthouse enclosure on an existing building to enclose new air handling equipment · 66 m away
- 1575 South Main Street · Tarrant County Hospital DistrictDec 9, 2025Jps pcp angio equipment replacement — renovation/alteration — replacement of pcp angio equipment · 66 m away
- 1575 S Main Street, Fort Worth, Texas 76104 · Jps HospitalJul 9, 2026Jps central utility plant — new construction — new central utility plant to serve the hospital district · 66 m away
- 200 Feliks Gwozdz Place · Tarrant CountyFeb 4, 2026Tarrant county medical examiner office drying rooms — renovation/alteration — renovation to approx. 380sf within the tarrant county medical examiners office to accommodate the installation of new drying equipment for investigations · 74 m away
- 1400 S Main St. Fort Worth, TX 76104 · Jps Health NetworkJun 9, 2025Jps jpoc 1400 renovation phase 1 — renovation/alteration — existing facility is a 4 story office building.the interior renovation is of level 02 and 03 of the jpoc 1400 building. existing administrative area will recieve new finishes and a new layout · 82 m away
- 1350 S Main St · Tarrant County Hospital DistOct 28, 2025Jpoc 1350 renovation phase 1 — renovation/alteration — interior renovation of the second floor of an existing 4 story medical office building · 119 m away
- 1300 South Main Street · Tarrant County Hospital District Dba Jps Health NetworkJan 9, 2026Jps medical outpatient building — new construction — this project includes outpatient services into a new 10-story mob planned for approximately 300,000 square feet (sq ft) · 153 m away
- 175 W Magnolia Avenue · Tarrant County Hospital DistrictDec 12, 2025Jps health center for women — new construction — interior finish out of retail shell space within existing parking garage as medical office space · 276 m away
- 400 W Magnolia Avenue · Ut Southwestern Moncrief Cancer InstituteOct 14, 2026Utsw mci 3rd floor infusion expansion — renovation/alteration — phase 1 on level 3 renovates an existing office space into a new infusion suite. phase 2 on level 3 renovates an existing office suite. phase 3 on level 2 renovates an existing pharmacy and adjacent infusion rooms to expand the pharmacy storage · 372 m away