1500 S. Main Street
Fort Worth, TX 76104 · Jps Hospital Addition, Mri Room 1 Equipment Upgrade + 2 more
JPS registers 1-million-square-foot replacement hospital addition
A 1,000,000-square-foot replacement hospital addition for JPS is planned at 1500 S. Main Street in Fort Worth. The project was registered with TDLR on November 20, 2025, and the applicant's estimated project cost is $938 million.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 20, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Nov 20, 2025
- since Dec 27, 2023
- Largest scope
- 1,000,000 sf
- Estimated cost
- $938M
- state registration
Where this project stands
Under constructionJPS Hospital Addition
1,000,000 sq ft · $938M est.
- RegisteredNov 20, 2025
- Plan review
- ConstructionMar '26 – Dec '30
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
4 projects1,000,000 sq ft replacement hospital addition — john peter smith hospital
TDLR project registrationNew ConstructionReview Complete1,000,000 sq ft$938M est.- Project #
- TABS2026006469
- Tenant / owner
- Jps Hospital Addition
- Design firm
- Pro
- Contact
- Pro
Equipment change out. small addition to building to accommodate equipment. new equipment provided by owner. (siemens 1.5t magnetom sola xj gradients) — jps main hospital
TDLR project registrationAdditions to Existing BuildingProject Closed400 sq ft$1.9M est.- Project #
- TABS2024008263
- Tenant / owner
- Mri Room 1 Equipment Upgrade
- Design firm
- Pro
- Contact
- Pro
Light fixture and mechanical system upgrades along with the replacement of existing lab automation equipment and the local utilities to support the equipment during a multiple phase installation. — jps hospital
TDLR project registrationRenovation/AlterationReview Complete4,374 sq ft$150K est.- Project #
- TABS2024003719
- Tenant / owner
- Jps Hospital Chemistry Analyzer Replacement
- Design firm
- Pro
- Contact
- Pro
Offices and conference rooms added to existing space. mep replacement. — thermal storage building
TDLR project registrationRenovation/AlterationInspection Complete1,902 sq ft$189K est.- Project #
- TABS2023019185
- Tenant / owner
- Jps P3 Interior Improvement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1500 S. Main Street
What is being built at 1500 S. Main Street in Fort Worth?
TDLR records describe a 1,000,000-square-foot replacement hospital addition for JPS. The project was registered on November 20, 2025.
How large is the JPS hospital addition?
The TDLR registration lists the project at 1,000,000 square feet.
When was the JPS hospital addition filed?
The project registration, TABS2026006469, was filed on November 20, 2025. Its listed status is Review Complete.
How much will the JPS hospital addition cost?
The applicant's TDLR estimate for the whole project is $938 million. This is an estimate, not a final project cost.
What's being built near the JPS Medical Outpatient Building on South Main Street?
A 1,000,000-square-foot replacement hospital addition for JPS is registered at 1500 S. Main Street, about 153 meters from the JPS Medical Outpatient Building.
Is the JPS hospital addition approved?
The TDLR record lists the registration as Review Complete. It does not state a construction start date.
Also being built nearby
All of 76104- 1500 S. Main · Jps Health NetworkJan 16, 2025Jps health main campus entry vestibule renovation — renovation/alteration — removal of an existing revolving door and storefront and replacing it with a pedestrian vestibule / new storefront and associated finishes
- 1500 S Main St · Jps Health NetworkApr 3, 2026Jps trinity springs toilet room finish upgrade — renovation/alteration — refresh finishes in patient toilet rooms
- 1575 S. Main Street · John Peter Smith HospitalAug 5, 2025Jps hospital ambulance drive relocation — renovation/alteration — site work including ambulance vehicle and police parking and interior renovation work associated with ambulance drive relocation · 66 m away
- 1575 S Main Street 1575 S Main Street · Jps Health NetworkJun 26, 2024Jps pavillion or - ahu replacement — additions to existing building — addition of mechanical penthouse enclosure on an existing building to enclose new air handling equipment · 66 m away
- 1575 South Main Street · Tarrant County Hospital DistrictDec 9, 2025Jps pcp angio equipment replacement — renovation/alteration — replacement of pcp angio equipment · 66 m away
- 1575 S Main Street, Fort Worth, Texas 76104 · Jps HospitalJul 9, 2026Jps central utility plant — new construction — new central utility plant to serve the hospital district · 66 m away
- 200 Feliks Gwozdz Place · Tarrant CountyFeb 4, 2026Tarrant county medical examiner office drying rooms — renovation/alteration — renovation to approx. 380sf within the tarrant county medical examiners office to accommodate the installation of new drying equipment for investigations · 74 m away
- 1400 S Main St. Fort Worth, TX 76104 · Jps Health NetworkJun 9, 2025Jps jpoc 1400 renovation phase 1 — renovation/alteration — existing facility is a 4 story office building.the interior renovation is of level 02 and 03 of the jpoc 1400 building. existing administrative area will recieve new finishes and a new layout · 82 m away
- 1350 S Main St · Tarrant County Hospital DistOct 28, 2025Jpoc 1350 renovation phase 1 — renovation/alteration — interior renovation of the second floor of an existing 4 story medical office building · 119 m away
- 1300 South Main Street · Tarrant County Hospital District Dba Jps Health NetworkJan 9, 2026Jps medical outpatient building — new construction — this project includes outpatient services into a new 10-story mob planned for approximately 300,000 square feet (sq ft) · 153 m away
- 175 W Magnolia Avenue · Tarrant County Hospital DistrictDec 12, 2025Jps health center for women — new construction — interior finish out of retail shell space within existing parking garage as medical office space · 276 m away
- 400 W Magnolia Avenue · Ut Southwestern Moncrief Cancer InstituteOct 14, 2026Utsw mci 3rd floor infusion expansion — renovation/alteration — phase 1 on level 3 renovates an existing office space into a new infusion suite. phase 2 on level 3 renovates an existing office suite. phase 3 on level 2 renovates an existing pharmacy and adjacent infusion rooms to expand the pharmacy storage · 372 m away