530 Tower Street, Garland, TX 75040
Garland, TX 75040 · City Of Garland, TX
Garland registered street and utility work at Emberwood and Sugarberry
Garland registered a project to reconstruct about 1,850 linear feet of existing residential street and replace water and wastewater lines at Emberwood Drive and Sugarberry Lane. The Texas Department of Licensing and Regulation registration was filed September 16, 2025, and lists an estimated project cost of $3.31 million.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 16, 2025
- since Sep 16, 2025
- Largest scope
- 1,850 sf
- Estimated cost
- $3.3M
- state registration
Where this project stands
Under constructionGarland 2025 Emberwood & Sugarberry-City of Garland
1,850 sq ft · $3.3M est.
- RegisteredSep 16, 2025
- Plan review
- ConstructionDec '25 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReconstruction of 1850 lf of existing residential street, replacement of approximately 1,820 of existing water line, and replacement of approximately 2,150 lf of existing wastewater line at emberwood dr. and sugarberry ln. — city of garland
TDLR project registrationRenovation/AlterationReview Complete1,850 sq ft$3.3M est.- Project #
- TABS2026000991
- Tenant / owner
- Garland 2025 Emberwood & Sugarberry-City Of Garland
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 530 Tower Street, Garland, TX 75040
What is being built at 530 Tower Street in Garland?
The TDLR registration describes street reconstruction and water and wastewater line replacements at Emberwood Drive and Sugarberry Lane. It was filed September 16, 2025, under project number TABS2026000991.
Is Garland building a new commercial building at this address?
The registration describes reconstruction of an existing residential street and replacement of existing water and wastewater lines, not a new commercial building.
What streets and utilities are part of the Garland project?
The project covers about 1,850 linear feet of existing street, approximately 1,820 linear feet of water line, and approximately 2,150 linear feet of wastewater line at Emberwood Drive and Sugarberry Lane.
When was the Emberwood and Sugarberry project registered?
The TDLR project registration was filed September 16, 2025. Its listed status is Review Complete.
How much will the Garland street and utility project cost?
The TDLR registration lists an applicant-estimated project cost of $3.31 million. This is an estimate for the project, not a final reported cost.
What work is planned near Llibasil Property Management on Tower Street?
The nearby Garland registration describes street and water and wastewater line reconstruction at Emberwood Drive and Sugarberry Lane. It does not describe construction at the Llibasil Property Management address.
Also being built nearby
All of 75040- 524 Tower Street · Llibasil Property ManagementJun 11, 2025Llibasil multi-storage project — new construction — new construction of three 4,950 sq ft shell pre-engineered metal buildings designed for future tenant space. new construction of surrounding landscape, parking & paving · 9 m away
- 1434 Commerce St · City Of GarlandDec 16, 2025Garland transfer station improvements — additions to existing building — a facilities improvement project to an existing 5,500 sq ft office building including: site improvements, a 400 sq ft building expansion, and interior renovations. new building footprint = 5,900 sq ft · 403 m away
- 2815 E. Centerville Road · Lcg2i Centerville LLCJan 14, 2026Leon capital group - centerville - spec office 2 — renovation/alteration — a 96,507 sq ft finish out within an existing 150,926 sq ft facility. it will include a 3,846 spec office · 501 m away