New parking structures in Haltom City 76117
2 addresses in 76117 have permits or project filings for parking structures in the last two years. The most recent was filed at 6010 Walker Street.
Latest filings
- 6010 Walker Street · Birdville ISDSep 10, 2026Bisd - shannon high school theater renovations — renovation/alteration — maintenance renovations of existing theater to include new flooring, ceilings, stage floor refinishing, curtain replacement, lighting and sound system
- 5020 NE Loop · Karmali Holdings INCMar 31, 2026Commercial shell building — new construction — new construction of a 6,700 sq ft commercial shell building including interior accessible routes, accessible restrooms, accessible entrances, and site accessibility improvements including ada parking, curb ramps, and paths of travel to building entrance
- 5534 E. Belknap Street · B&b9, LLCMay 30, 2025Haltom city car lot — new construction — install 600 square foot concrete foundation. install 30x20 metal building with 3 offices, 1 ada restroom, 5 interior doors, and 2 exterior doors. install electricity, hvac unit, and plumbing. install parking lot to include handicap parking
Questions
What parking structures are being built in Haltom City 76117?
2 addresses in 76117 have permits or project filings for parking structures in the last two years. The most recent was filed at 6010 Walker Street. Others include 5020 NE Loop, 5534 E. Belknap Street.
How can I find out when a new parking project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new parking project permit is filed.