1414 Fannin
Houston, TX 77002 · Scd Block 317 LLC
JPMC childcare center plans interior and playground upgrades
A renovation at the JPMC backup childcare center at 1414 Fannin includes interior finish upgrades, replacement of the existing exterior canopy fabric, and playground area finishes. The TDLR project registration was filed April 14, 2026, and lists an estimated project cost of $800,000.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 14, 2026
- since Apr 14, 2026
- Largest scope
- 10,000 sf
- Estimated cost
- $800K
- state registration
Where this project stands
Finishing up · inspection nextJPMC CHILDCARE
10,000 sq ft · $800K est.
- RegisteredApr 14, 2026
- Plan review
- ConstructionJun '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectScope of work is limited to interior finish upgrades, replacement of existing exterior canopy fabric and playground area finishes. no changes to life safety, exiting, current occupancy, fire ratings, or egress are proposed as part of this project. — jpmc back-up child care center
TDLR project registrationRenovation/AlterationReview Complete10,000 sq ft$800K est.- Project #
- TABS2026017639
- Tenant / owner
- Jpmc Childcare
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1414 Fannin
What is being built at 1414 Fannin in Houston?
The JPMC backup childcare center is slated for interior finish upgrades, replacement of its existing exterior canopy fabric, and playground area finish work. The TDLR registration does not describe a new building.
When was the JPMC childcare project at 1414 Fannin filed?
The TDLR project registration was filed April 14, 2026. It is listed as TABS2026017639.
Is the project at 1414 Fannin a new daycare?
The filing describes renovation work at the existing JPMC backup childcare center, not a new daycare. It says the project does not propose changes to current occupancy or life-safety and egress conditions.
What is the estimated cost of the 1414 Fannin renovation?
The TDLR registration lists an estimated project cost of $800,000. This is the applicant's estimate for the project.
What's being renovated near the apartment complex at 1133 Clay Street?
The project at 1414 Fannin is an interior and playground-area renovation at the JPMC backup childcare center. The TDLR registration was filed April 14, 2026.
Also being built nearby
All of 77002- 1133 Clay St · Apartment ComplexAug 5, 2026- apt repair spec list/re-roof · 64 m away
- 1415 Fannin StAug 21, 2019(epr)office remodel (harvey renovat.) (3/3) · 64 m away
- 1414 Fannin St · Jpmc DaycareJul 9, 20263,006 sq ft daycare remodel · 72 m away
- 1301 Fannin St · Netrality PropertiesJul 8, 2026Office remodel, (2/2) · 79 m away
- 1301 Fannin St F13.5Mar 18, 2022Demolition non-load bearing wall, office · 79 m away
- 1519 Fannin StMay 30, 2019Demolition bld/sewer disc · 105 m away
- 1301 Fannin Street · 1301 FanninJul 29, 2024Accenture - level 18 interior remodel — renovation/alteration — interior remodel of portion of level 18, open office area to become meeting room, restroom renovation, addition of security turnstiles · 113 m away
- 1301 Fannin Street · 1301 Fannin Owner, LPNov 6, 2026Netrality 9th fl suite b — renovation/alteration — minor modifications for addition of mechanical and electrical equipment · 113 m away
- 1301 Fannin St Lvl 23 · 1301 Fannin Owner LPAug 4, 20251301 fannin st lvl 23, suite 2330 — renovation/alteration — interior remodel of tenant suite including office layout & interior finishes. existing ceiling and lighting to remain · 113 m away
- 1301 Fannin · 1301 Fannin Owner LPAug 25, 2025Cheniere gas control — renovation/alteration — interior buildout of existing, demolished space to provide renovated office for tenant · 113 m away
- 1301 Fannin Level 9 · 1301 Fannin Owner LPJun 3, 20261301 fannin level 9 data center reno — renovation/alteration — relocation of corridor wall and addition of temporary interior wall at data center for relocation of data machinery. partial reno of piping above plenum to tie-in to new machinery · 113 m away
- 1515 Main St · Fairfield Block 334 LPSep 1, 2026Apartment balcony repair · 119 m away