6100 Main St Bld3
Houston, TX 77005
6100 Main St Bld3: 1 project on record
City of Houston lists 1 filing across 1 project at 6100 Main St Bld3, Houston, TX 77005. The most recent, filed November 27, 2018, covers: “(epr)19,820 sq ft university remodel '12 ib c 100%”.
Compiled from City of Houston records · updated Nov 27, 2018
- Projects
- 1
- 1 filings
- Latest filing
- Nov 27, 2018
- since Nov 27, 2018
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2018 · no recent filings(epr)19,820 sq ft university remodel '12 ib c 100%
- Building permitNov 27, 2018
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
1 projectSources: City of Houston
Questions about 6100 Main St Bld3
What is being built at 6100 Main St Bld3?
The latest filing (City of Houston permit 18101181, November 27, 2018) covers (epr)19,820 sq ft university remodel '12 ib c 100%.
How many permits and filings does 6100 Main St Bld3 have?
1 filing across 1 project, from November 27, 2018 to November 27, 2018.
What is being built near Rice University in Houston?
6100 Main St Bld3 is about 0 m from Rice University (6100 Main St Ms 750). Its latest filing is for (epr)19,820 sq ft university remodel '12 ib c 100%.
Is there other construction near 6100 Main St Bld3?
Yes. Nearby filings include 6100 Main St B-133 (commercial interior remodel, Nov 8, 2018); 6100 Main St Bld75 ((epr)university(hpm rooms) remodel 100%, Apr 27, 2018); 6100 Main St Ms 750 (local food inc "brochstein pavilion" — renovation/alteration — 735 sq ft food/ coffee kiosk remodel, Jul 17, 2024).
How do I get alerts for new permits at 6100 Main St Bld3?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77005- 6100 Main St B-133Nov 8, 2018Commercial interior remodel
- 6100 Main St Bld75Apr 27, 2018(epr)university(hpm rooms) remodel 100%
- 6100 Main St Ms 750 · Rice UniversityJul 17, 2024Local food inc "brochstein pavilion" — renovation/alteration — 735 sq ft food/ coffee kiosk remodel
- 6100 Main StSep 14, 2018(epr)superstructure & found'n for fut college sp
- 6100 Main St. Houston, TX 77005 · William Marsh Rice UniversityJun 29, 2026The original lovett college renovation - phase 3 — renovation/alteration — renovation of existing dorm into fair housing compliant resident assoc. dwelling unit, and converting three existing rooms to dormitory offices
- 6100 Main Street · Dell Butcher HallOct 30, 2026Dr. reece lab - dell butcher hall 120 — renovation/alteration — the project consists of the renovation of approximately 1,324 sq ft of existing laboratory space. the scope includes selective demolition, installation of new laboratory casework, modifications to mep systems to support operations, and new finishes
- 6100 Main Street - Rice University Campus · Rice UniversityFeb 23, 2024Rice biosciences labs — renovation/alteration — non-structural interior renovations to existing laboratories in the basement, second level, and third level. limited demolition of interior partitions. new partitions, doors, finishes, and ceilings. no change to current occupancies
- 6100 Main St Bld77Jul 12, 2018Commercial foundation repair
- 6100 Main St C-160May 16, 2017New floor drain in existing lab room
- 2 Sunset Blvd · Rice UniversityJul 21, 2025Residential cmu fence addition · 81 m away
- 9 Sunset Blvd · Rice UniversityMar 6, 2024Rice university - brown renovation — renovation/alteration — interior renovation of level 1 and basement of a residential college at rice university. student rooms on levels 2 through 8 area excluded from the scope · 84 m away
- 1 Longfellow LnJul 21, 2017New residential swimming pool · 172 m away