New schools & daycares in Houston 77005
9 addresses in 77005 have permits or project filings for schools & daycares in the last two years. The most recent was filed at 5311 Mercer St.
Latest filings
- 5311 Mercer St · St. George Orthodox ChurchNov 4, 2026St. george fellowship activity center phase 1 — new construction — construction of a new parish hall & interior finish out of first floor
- 6100 Main Street · Dell Butcher HallOct 30, 2026Dr. reece lab - dell butcher hall 120 — renovation/alteration — the project consists of the renovation of approximately 1,324 sq ft of existing laboratory space. the scope includes selective demolition, installation of new laboratory casework, modifications to mep systems to support operations, and new finishes
- 6100 Main St · Rice University (design Alliance)Sep 23, 2026Commercial ada ramp for office 21
- 6100 Main · Rice UniversityMay 27, 2026268,849sf college dorm bld 21' sp
- 1500 Sunset Boulevard · Congregation Emanu ElMar 16, 2026Kitchen renovation at the existing temple building — renovation/alteration — renovation of the existing commercial kitchen at the existing temple building, which includes updating cabinetry, finishes, and replacing food service equipment
- 4800 Wakeforest Ave · City Of West University PlaceMar 10, 2026City of west university place construction plans for wakeforest distribution line improvements — renovation/alteration — this project is primarily the construction of a 24" and 16" wl along wakeforest st in the city of west university and city of houston. this project also includes removal and replacement of sidewalks, ada ramps, and crosswalks
- 1500 Sunset Blvd EMar 4, 202625263 sq ft religious assembly/education (m/4) sp
- 1500 Sunset Blvd Dcare · Congregation Emanuel Becker Early ChildhoodOct 3, 2025Remodel exist becker school (4/4) 21
- 6100 Main St B-13 · Brockman HallSep 3, 20251,021 sq ft school lab buildout
- 2520 Sunset Blvd · Lmm SunsetMay 22, 2025Daycare exterior repair per spec list
- 6100 Main St BsmtAug 27, 2024500 sq ft audio & photgraphy studio remodel sp
- 3814 Bissonnet StMar 18, 20245,000 sq ft convert to pet daycare
- 23 Sunset Blvd · Rice UniversityMar 6, 2024Rice university - jones north renovation — renovation/alteration — interior renovation of level 1 and basement of a residential college at rice university. student rooms on levels 2 through 4 area excluded from the scope
- 9 Sunset Blvd · Rice UniversityMar 6, 2024Rice university - brown renovation — renovation/alteration — interior renovation of level 1 and basement of a residential college at rice university. student rooms on levels 2 through 8 area excluded from the scope
- 3202 Mercer St · Rice UniversityMar 5, 2024Rice university - jones south renovation — renovation/alteration — interior renovation of level 1 and basement of a residential college at rice university. student rooms on levels 2 through 4 area excluded from the scope
- 6100 Main BsmtJun 27, 202349,175 sq ft school engineering office bldout
- 2317 Bissonnet StFeb 15, 20232,457 sq ft new daycare building
- 6100 Main St B-08Mar 10, 20221,320 sq ft university lab remodel
- 6100 Main(sid Richardson ResidentstJun 10, 2021College (214) new solar modules 100% / 2012 ib
- 2434 Sunset BlvdAug 21, 20201460 sq ft cnvrt ofc to daycare
- 2329 Bissonnet StJun 24, 2020(epr) new splash pad with equipment for daycare
- 6100 Main St B-21Jun 18, 2020Classroom remodel in brown hall
- 6100 Main St Bld3Nov 27, 2018(epr)19,820 sq ft university remodel '12 ib c 100%
- 5417 Chaucer DrOct 29, 2018(epr) cnvrt office building to daycare 100%
- 6100 Main St Bld75Apr 27, 2018(epr)university(hpm rooms) remodel 100%
Questions
What schools & daycares are being built in Houston 77005?
9 addresses in 77005 have permits or project filings for schools & daycares in the last two years. The most recent was filed at 5311 Mercer St. Others include 6100 Main Street, 6100 Main St, 6100 Main.
How can I find out when a new school is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new school permit is filed.